Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
I want to know how to draw bending moment diagram for this shape and the value of the moment in critical sections assume that the distributed load (w) KN/M and the concentrated load (p) N
Writing case study about bridge collapse
Axis of the hole is perpendicular to VP. Draw elevation, plan and development of the lateral surfaces of the pyramid.
The central angle is 35 degrees, the superelevation is 0.08, and 20.6 ft is cleared (for sight distance) from the inside edge of the innermost lane. Determine a maximum safe speed (assuming current design standards) to the nearest 5 mi/h.
The total flow then moves to a point W on the traction drive two metres off the ground, and travels through a nine millimetre diameter conduit. Ignoring all friction and minor losses, determine the pressures at points H and W.
The 3.5-Mg engine is suspended from a spreader beam having a negligible mass and is hoisted by a crane which exerts a force of 40 kN on the hoisting cable. Determine the distance the engine is hoisted in 2.4 s, starting from rest.
A tape is calibrated and found to measure 100.04ft between the 0- and 100-ft marks. What measurements should be laid out to establish a horizontal distance of 682.25ft?
Find the expanded depth of the bed after the backwash when initial depth of the bed is 3 ft using given conditions. μ = 0.01g/cm/sec, T = 25oC, ρs = 2.65, ρ=1, washrate = 1.5 cm/sec, ks2 = 196. (Assumed single size)
Compare the total reactor volume required for 90% removal of the same pollutant in a CSTR system that contains a single reactor against a system that contains three CSTR reactors of equal volume in series.
A force, 90 N in magnitude, is applied to control rod AB as shown. Knowing that the length of the rod is 225 mm, determine the moment of the force about point B by resolving the force into components along AB and in a direction perpendicular to AB..
Calculate average figures for tonnes/round and powder factors in kg/tonne and Determine the drill metres required to achieve a production rate from grade control blasting.
Could all the people in china hold back the water behind the three gorges dam?
The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd