An equal tangent vertical curve is to be constructed between grades of -3.0% (initial) and 1.0% (final). The PVI is at station 110+00 and elevation 420 ft. Due to a street crossing the roadway, the elevation of the roadway at station 112+00 must be at 424.5 ft. Design the curve

Reference no: EM13299142

Questions Cloud

Karleen goerke : Write an initial substantive response of 50 words in length. Begin your response with a restatement of the question/prompt, and include in-text citation(s) and a reference for each scholarly source used according to the APA guidelines found in the AP..
What cash flow must the investment provide : Your regard 8% as an appropriate rate of return on a low risk but illiquid 7 year loan. What cash flow must the investment provide at the end of each of the final 4 years, that is, what is X?
How much must the grandfather put into ed trust : how much must the grandfather put into Ed's trust today and each subsequent year to enable him to have the same retirement nest egg as Steve after the last payment is made on their 65th birthday?
Find where is the final image relative to second lens formed : Two converging lenses, each of focal length 14.5 cm, are placed 59.2 cm apart, and an object is placed 27.4 cm in front of the first. Where is the final image relative to the second lens formed
How to design the curve of the roadway at station : An equal tangent vertical curve is to be constructed between grades of -3.0% (initial) and 1.0% (final). The PVI is at station 110+00 and elevation 420 ft. Due to a street crossing the roadway, the elevation of the roadway at station 112+00 must b..
State the initial temperature of the ethylene glycol : A 23.7-g sample of ethylene glycol, a car radiator coolant, loses 906 J of heat. What was the initial temperature of the ethylene glycol if the final temperature is 32.5 degrees Celsius (c of ethylene glycol=2.42 J/g*K)
Sustainable development report l oreal : Here is the link of the document: PLease click on Sustainable Development Report which is the 3rd document only on the bottom right hand side (50 pages).http://www.loreal-finance.com/eng/annual-report By relying on the 2013 Sustainable Development Re..
Determine how far is the object from the mirror : The side-view mirror of an automobile hasa radius of curvature of 11.5 cm. How far is the object from the mirror
Training and development session : Your training and development session about teams with the managers went very well, so well that the participants expressed a desire to have some of the information that you discussed to be available in writing so they can reference it, as needed. On..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the settlements having stress

The soil properties of the clay are Cc = 0.25, Cr = 0.05, gsat = 18 kN/m 3 , for the sand gsat = 18 kN/m 3 , and the water table is 2 m below the soil surface. Determine the settlements when a stress of 100 kPa is applied by the building over an a..

  Calculate specific internal energy of water leaving valve

Water is at 9000 kPa and 300 degrees celcius and flows through a partially open valve. Pressure immediately after the valve is measured to be 600 kPa. Calculate the specific internal energy of the water leaving the valve

  How fast will it be going when it hits the ground

How fast will it be going when it hits the ground?

  Required to dewater a construction site

It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m.

  Find the optimal solution

The company would like to distribute the songs between the two CDs such that the used space on each CD is about the same. Formulate the problem as an IP, and find the optimal solution.

  Rectangular duct carries air

A 30mm pipe X 460 mm rectangular duct carries air. What size square conduit is needed to transport 4m cube per sec of water at a distance of 45m and head loss of of 1.08m.

  Determine what is the balance delay for the solution

A proposal has been submitted to replace a group of assembly workers, each working individually, with an assembly line. The following table gives the individual work elements. The demand rate for this job is 1600 units/week (assume 40h/week)

  Calculate the molar mass of the biomolecule

For carbon tetrachloride, the boiling point constant is 5.03°C · kg/mol, and the boiling point of pure carbon tetrachloride is 76.50°C.

  Duplex system with no redundancy

What is the salt usage for each regeneration if the system regenerated every 10 days? What size resin tanks (diameter, height) would be required for a duplex system with no redundancy?

  Calculate the speed at impact on a large rock

A large rock became visible to a driver at a distance of 175 ft. Assuming a perception-reaction time of 0.8s, an initial speed of 42 mph, a coefficient of friction equal to 0.5, and a level roadway, calculate the speed at impact.

  Assist structural engineer for a bridge replacement project

You should provide the structural engineer with a formal typed report that will include all of your analyses and final size of the footing. You should also include all of your design assumptions in your report.

  Comparative analysis of the types of safeguards

Provide a comparative analysis of the types of safeguards would you suggest for the company's information system.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd