A highway reconstruction project is being undertaken to reduce crash rates. the reconstruction project involves a major realignment of the highway such that a 60mi/h design speed is attained. at one point on the highway, a 720 ft equal-tangent crest vertical curve exists. measurements show that at 3+40 stations from the PVC, the vertical curve offset is 3.5 ft. assess the adequacy of this existing curve in light of the reconstruction design speed of 60 mi/h and if the existing curve is inadequate,compute a satisfactory curve length.
THE HOME DEPOT IN RED HOOK ,BROOKLYN IS LOOKING TO RENOVATE THEIR STEEL ROOF TRUSS.YOU HAVE BEEN ASKED TO DETERMINE THE CENTROID,MOMENT OF INERTIA,SECTION MODULUS AND RADIUS OF GYRATION OF THE DOUBLE ANGLE.
A rectangular gate 6 ft tall and 5 ft wide in the side of an open tank is held in place by the force F as indicated in the figure. The weight of the gate is negligible, and the hinge at O is frictionless.
A power plant operates at steady-state. It receives energy from a hot source (combustion of fuel) at a temperature of 420 oC. The plant discharges this energy to a nearby river that acts as a cold source.
Two particles start from the same point along the same straight line and at the same instant. The first particle travels with a constant velocity v and the second with a constant acceleration.
A fluid film 0.1 mm thick separates solid and surface. The fluid viscosity is 0.04 N*sec/m^2. Assuming the velocity distribution in the film is linear, find the terminal velocity of the block. The area of the cube in contact with the film is 0.25 ..
A load is to be raised 20 ft by the hoisting system. Assuming Gear A is initially at rest, accelerates uniformly to a speed of 120 rpm , determine (a) the number of revolutions exected by gear A in raising the load. (b) The time required to raise ..
Discuss and use examples to explain the specific factors that you will need to consider when pricing the following items in the bill of quantities foundation excavation
Assume for your calculations that each member is in tension, and include in your response the sign of each force that you obtain by applying this assumption.
A 45 kg machine is placed at the end of a 1.6 m long cantilever beam of elastic modulus 200 x 109 N/m and cross-sectional moment of inertia 1.6 x 10-5 m4.
a) calculate the operational compressive strain this copper specimen is subjected to. b) calculate the maximum strain this copper alloy can sustain without becoming plastically deformed.
The pavement is on a base which has a modulus of subgrade reaction of 250 pci. A 17,000 lb corner load is applied (al is 7 inches). Using the revised Westergaard equations, find the modulus of elasticity of the pavement if a corner deflection of 0..
The "supersoaker" water gun can shoot more than 30 ft in the horizontal direction. Estimate the minimum pressure, , needed in the chamber in order to accomplish this. List all assumptions and show all calculations.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!