Reference no: EM132836794
Question - Comparing ABC and Plantwide Overhead Cost Assignments
Wellington Chocolate Company uses activity-based costing (ABC). The controller identified two activities and their budgeted costs:
Setting up equipment $638,000
Other overheard $6,000,000
Setting up equipment is based on setup hours, and other overhead is based on oven hours.
Wellington produces two products, Fudge and Cookies. Information on each product is as follows:
Fudge Cookies
Units produced 8,000 445,000
Setup hours 8,800 2,200
Oven hours 5,000 35,000
Required -
1. Calculate the activity rate for (a) setting up equipment and (b) other overhead.
2. How much total overhead is assigned to Fudge using ABC?
3. What is the unit overhead assigned to Fudge using ABC? Round to the nearest cent.
4. Now, ignoring the ABC results, calculate the plantwide overhead rate, based on oven hours. Round to the nearest cent.
5. How much total overhead is assigned to Fudge using the plantwide overhead rate?
6a. The difference in the total overhead assigned to Fudge is different under the ABC system and non-ABC system because.
6b. What is the difference in total overhead assigned to fudge under the two methods?