Greendale Stadium Case

The G&E Company is preparing a bid to build the new 47,000 seat Greendale baseball stadium. The construction must start July 1, 2011, and be completed in time for the start of the 2014 season. A penalty clause of $100,000 per day of delay beyond May 20, 2014, is written into the contract.

Ben Keith, the president of the company, expressed optimism at obtaining the contract and revealed that the company could net as much as $2 million on the project. He also said if they are successful, the prospects for future projects are quite good since there is a projected renaissance in building classic ball parks with modern luxury boxes.

CASE APPENDIX: TECHNICAL DETAILS OF THE GREENDALE BASEBALL STADIUM

The baseball stadium is an outdoor structure with a retractable roof. The project begins with clearing the site, an activity that lasts 70 days. Once the site is clear, work can start simultaneously on the structure itself and demolishing an adjacent building site. This demolition is necessary to create a construction stage for storing materials and equipment. It will take 30 days to demolish the buildings and another 70 days to set up the construction site.

TABLE 6.3 Greendale Stadium Case

The work on the stadium begins by driving 160 support pilings, which will take 120 days. Next comes the pouring of the lower concrete bowl (120 days). Once this is done and the construction site has been set up, then the pouring of the main concourse (120 days), the installation of the playing field (90 days), and the construction of the upper steel bowl can occur (120 days).

Once the concourse and upper bowl are completed, work can start simultaneously on building the luxury boxes (90 days), installing the seats (140 days), installing the jumbotron (30 days), and installing stadium infrastructure (120 days) which includes: bathrooms, lockers, restaurants, etc. Once the seats are installed then the steel canopy can be constructed (75 days) followed by the installation of the lights (30 days).

The retractable roof represents the most significant technical challenge to the project. Building the roof track supports (90 days) can begin after the lower concrete bowl is constructed. At this time the dimensions of the roof can be finalized and the construction of the roof at a separate site can begin (180 days). After the roof supports are completed then the roof tracks can be installed (90 days). Once the tracks and the roof are completed then the roof can be installed and made operational (90 days). Once all activities are completed it will take 20 days to inspect the stadium.

For purposes of this case assume the following:

1. The following holidays are observed: January 1, Memorial Day (last Monday in May), July 4th, Labor Day (first Monday in September), Thanksgiving Day (4th Thursday in November), December 25 and 26.

2. If a holiday falls on a Saturday then Friday will be given as an extra day off, and if it falls on a Sunday then Monday will be given as a day off.

3. The construction crew work Monday through Friday.

Greendale Project ReDux

This assignment consists of two parts: a project schedule, and a written response. You must submit both parts as separate files for the completion of this assignment. Label each file name according to the part of the assignment it is written for.

Part A: Project Schedule

1. Create a multi-level work breakdown structure (WBS) and detailed project schedule, using the information from the "Greendale Stadium Case" located at the end of Chapter 6, and incorporating the following constraints.

Note: When you create your MS Project schedule, you will need to update your project per the following constraints:

o The project must consist of at least twenty tasks.
o Each task must have a start and finish date that matches the duration noted in the assignment.
o Each task must be assigned to a resource (e.g., Demolishing Crew; Construction Crew; Landscaping Crew).
o Assume that the crew works during normal weekdays (no weekend work) under normal conditions (8 hours per day).
o In terms of holidays, you can assume no work will be done the following days: New Year's Day, President's Day, Good Friday, Good Monday, Friday before Memorial Day, Memorial Day, the business day before Independence Day, Independence Day, the Friday before Labor Day, Labor Day, the day before Thanksgiving Day, Thanksgiving Day, Black Friday (day after Thanksgiving), the business day before Christmas, Christmas Day, the business day after Christmas Day, and New Year's Eve.

Part B: Written Response

Respond to the following questions in a one to two page paper based on your project schedule.

o When will the project be completed?
o What is the critical path for the project?
o How much slack / float is in your project? What activities have the greatest slack / float?
o Identify the top three activities that you believe could impact the project completion date.
o What additional activities you would add to this project to make it more complete, from a project management viewpoint?

Format your assignment according to the following formatting requirements:

o Typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

o Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page is not included in the required page length.

Reference no: EM131501617

Questions Cloud

Mention what went wrong in the landings : Explain the invasion of Tarawa islands by America. Mention what went wrong in the landings.
Write an essay about the cultural impact of popular music : Write an essay about the cultural impact of popular music on society, and how it reflects the social issues of its time of production.
Discuss problematic nature of attempting to define culture : Discuss the problematic nature of attempting to define popular culture. Why is it such a difficult subject to find a working definition?
Determine marias level of expressive : Explain at least three informal language proficiency instruments you can use in your classroom to determine Maria's level of expressive.
How much slack or float is in your project : What is the critical path for the project? How much slack / float is in your project? What activities have the greatest slack / float?
Period of chinese history up to ming dynasty : Would you argue that the period of Chinese history up to Ming Dynasty is better characterized by unity or disunity? Give specific examples of both.
What is the structure of your partnership : Use comparative analysis of potential companies in term of strategic fit with your client. What is the structure of your partnership: joint venture/acquisition?
Investment strategies more effective than passive strategies : Are active investment strategies more effective than passive strategies? Why or why not?
Who is living in your backyard : What issues, related to the standardized assessments and real-classroom assessments can Mrs. Madison expect to encounter?

Reviews

Write a Review

Project Management Questions & Answers

  Question related to depreciation tax shield

The company has a marginal tax rate of 34 percent and what is the value of the depreciation tax shield?

  Describe the similarities in the quality improvement

Describe the similarities in the quality improvement philosophies of Deming, Juran, and Crosby.

  Important information about learning curve

how many batches of 500 checks will he be able to work at the standard rate of 1,000 checks per hour

  Calculate the eoq and calculate the reorder point

Calculate the EOQ. - Calculate the reorder point. - Calculate the safety stock. - If we purchase 80 units or more, the unit purchase cost is reduced to $19. Calculate the EOQ for this quantity discount case.

  Pmi and it project team roles

PMI and IT project team roles are noted - would you even consider hiring that person to manage an IT project

  How do business ethics and business law interact

How do business ethics and business law interact with each other?-  How does the WH approach to ethics respond to an ethical problem?

  What are the banks rights if any against the supermarkets

What are the Bank's rights, if any, against the supermarkets? You may assume that the supermarkets cashed all of the checks in good faith.

  Why do you feel that this will allow for successful project

Why do you feel that this will allow for a successful project? What procurement management processes will you use within your plan? Why?

  How much profit does ahabs earn

How much profit does Ahab's earn, and how much surplus does each type of consumer obtain?- Show that Ahab's can do better than in part c by reducing the size of the small cup from 8 ounces to 6 ounces.

  Supermarket bakery system on a strict first-come supermarket

Is it good or bad to operate a supermarket bakery system on a strict first-come, first-served basis? Why?

  Define cpk and explain what a cpk of 1 means

Define Cpk and explain what a Cpk of 1.0 means. - What is Cp ? -  What does a run of 5 points above or below the centerline in a control chart imply?

  How do metrosexuals differ from other male consumers

What are gender roles? How do metrosexuals differ from other male consumers?- What is the significance of family life cycle and lifestyle in understanding consumer behavior and purchasing decisions?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd