An equipment installation job in the completion stage can be completed in 30 days of 8 hour day work, with 40 men working.
With the contract expiring in 30 days, the mechanical engineer contractor decided to add 10 men on the job, overtime not being permitted.
If the liquidated damages is Php2,000 per day of delay, and the men are paid Php80 per day, will the engineer be able to complete the job on time? How much should he save money with the addition of workers?
At all other times, the wind velocity is zero. Determine for each case the ration of the total energy available from the wind to the total wind energy available at the mean velocity operating continuously
If an array holds integer, each of which is four bytes long, how many bytes from the base location of the array is the location of the fifth element?
Determine the height, h, the water level will rise in the tank before remaining constant. Also, if initially the tank is empty, what amount of time will it take for the water level to rise to h? Be sure to justify all assumptions made.
The L bracket shown below is pinned to the ground at point C and attached to a single cable at points A and D that wraps around a frictionless pulley at point B. Determine the forces acting on the bracket at point C and then tension in the cable.
Your home town is growing so rapidly that another water tower is necessary to meet the needs of the community. Civil and environmental engineers predict that the water tower will need to hold 1.00 X 10.0^6 kilograms of water.
If metal sorption to algae can be modeled by a Langmuir isotherm, determine the mass distribution (sorbed vs dissolved) of lead in the marsh. Langmuir Isotherm Parameters Cs , sat 100 mg/g a 0.1 L/mg
The proposed 4 story reinforced concrete office building including a green roof is to be constructed.
For the FE pin-pin cable model, solve for the deflection and reactions using the partitioned form. What is partitioned form
Air photos are taken with specified overlap to take advantage of image parallax. Calculate the time interval between air photo exposures if the ground speed of the aircraft is 160km/h, the focal lenght is 50mm,
The venturi meter is in a 60 cm pipe. What deflection will occur on a mercury-water manometer connected between the upstream and throat section if the discharge is .57 m^3/s. Assume T = 20 C
Pressure loss in the suction pipe work is directly proportional to water veloicty in the pipe work squared, which is inversely proportional to suction pipe work diameter squared.
The developer hires you to conduct a soils investigation as part of the due diligence process. Describe how you would conduct this investigation.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd