How much net power as work is produced for process heat

Assignment Help Civil Engineering
Reference no: EM131250025

1. A steam power plant has 4 MPa, 500?C into the turbine, and to have the condenser itself deliver the process heat, it is run at 101 kPa. How much net power as work is produced for process heat of 13 MW?

2. Steam must be generated at 150?C for process heat in a food production facility. This is done in a combined heat and power system as extraction steam from the turbine. Assume the standard cycle has a turbine inlet of 3 MPa, 450?C and 60?C in the condenser. What pressure should be used for the extraction so that a maximum of process heat at 150?C is available and the least amount of turbine work is lost?

Reference no: EM131250025

Questions Cloud

Organizational development and strategy : Appraise the importance of the OD field in terms of its benefits in increasing business performance. Compare and contrast the internal levels of change and resistance, and then conclude which level would be the most difficult to address. Justify yo..
Calculate and report the unique nash equilibrium of the game : Represent this game in the normal form. - Calculate and report the unique Nash equilibrium of this game. - Is there a perfect Bayesian equilibrium with the strategy profile you found in part (b)?
Find the power cogenerated by the turbine : The high temperature heater adds 30 MW and the low temperature heater adds 31 MW to the district heating water flow. Find the power cogenerated by the turbine and the temperature in the return line to the deaerator.
Who is ultimately responsible for managing a technology : What are the differences between a policy, a standard, and a practice? What are the three types of security policies? Where would each be used? What type of policy would be needed to guide use of the Web? E-mail? Office equipment for personal use?
How much net power as work is produced for process heat : A steam power plant has 4 MPa, 500?C into the turbine, and to have the condenser itself deliver the process heat, it is run at 101 kPa. How much net power as work is produced for process heat of 13 MW?
Ineffective communication is the fault of the sender : 1. "Ineffective communication is the fault of the sender." Do you agree or disagree? Discuss. 2. Using the concept of channel richness, give examples of messages best conveyed by email, in face-to-face communication, and on the company bulletin boa..
Why is our culture so obsessed with appearances : Why is our culture so obsessed with appearances - Why do you dress the way you do and Why does fashion change?
Strategic approach to human resource management : Assess Southwest Airlines' strategic approach to human resource (HR) management. Determine how its strategy increases organizational effectiveness.
What is the difference in net power : What is the additional heat transfer rate to the steam generator beyond what would have been required to produce only the desired steam supply? What is the difference in net power?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Explain how to calculate the mass flowrate in methane

Assuming the resulting hole acts like an isentropic converging nozzle with a throat diameter of 0.08 cm, calculate the mass flowrate in kg/s of methane that initially escapes from the tank.

  Estimate settlement of footing four years after construction

The modulus of elasticity of the sand was determined to be 10,000 kN/m^3 throughout. Using the Schmertmann's method, estimate the settlement of the footing four years after construction, using four 1 meter thick sublayers.

  What is the uniform deterministic arrival rate

A ferryboat queuing lane holds 40 vehicles. If vehicles are processed (tolls collected) at a uniform deterministic rate of 5 vehicles per minute and processing begins when the lane reaches capacity

  Find the factor of safety based on the ultimate force

An eighteen inch diameter sandstone column is subjected to an axial compressive force of 2x10^6 lb / ft. Find the factor of safety based on the ultimate compressive force. For the ultimate compressive stress of sandstone=85Mpa.

  Calculate rocket position velocity and accelaration

To calculate a rocket’s position, velocity, and acceleration at different points in time. A rocket, initially at rest on the ground, accelerates straight upward with a constant acceleration of 58.8m/s^2

  Find what is the standard deviation for n equal to 40

Lines of levels were run requiring (n) instrument setups. If the road reading for each backsight and foresight has a standard deviation of +-0.005 ft what is the standard deviation for n=40

  Find factor of safety for a 9 foot long hollow steel column

Determine the factor of safety for a 9 foot long hollow steel column 3.5 inches on a side that has a wall thickness of 0.225 inches and is loaded with a 22 kip load.

  Determine the force in cylinder ab due to combined weight

Determine the force in cylinder AB due to the combined weight of the bucket and operator

  Determine the depth of flow if the flow is to be non-erosive

A trapezoidal channel is to be excavated in alluvial material on a bed slope of 1:10000. The side slopes will be 1(vertical) : 2(horizontal). Details of the bed material are as follows: Particle diameter 4 mm

  Find probability that in sample of bulbs will be defective

Find the probability that in a sample of 100 bulbs, (a) 0 bulbs will be defective (b) 1 bulbs will be defective (c) 2 bulbs will be defective (d) 3 bulbs will be defective (e) 4 bulbs will be defective (f) 5 bulbs will be defective

  What tensile force will cause the bar to yield

What is the Modulus of Elasticity for the material of the bar. What tensile force will cause the bar to yield? What will be the length of the bar after a 540 kip force is applied?

  Determine what is the maximum flow rate that can be pumped

assume the pipe diameter is 4-inches, (f = 0.035), Distance from BC is 15-feet, distance DE is 180-feet and z = 60-feet. The elevation of C is 10-feet above the lower water surface.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd