Reference no: EM132463779
Wilmington Company has two manufacturing departments--Assembly and Fabrication. It considers all of its manufacturing overhead costs to be fixed costs. The first set of data that is shown below is based on estimates from the beginning of the year. The second set of data relates to one particular job completed during the year--Job Bravo.
Estimated Data Assembly Fabrication Total
Manufacturing overhead costs $ 4,800,000 $ 5,280,000 $10,080,000
Direct labor-hours 120,000 72,000 192,000
Machine-hours 48,000 240,000 288,000
Job Bravo A ssembly Fabrication Total
Direct labor-hours 25 17 42
Machine-hours 17 20 37
Required:
Question 1. If Wilmington used a plantwide predetermined overhead rate based on direct labor-hours, how much manufacturing overhead would be applied to Job Bravo?
Question 2. If Wilmington uses departmental predetermined overhead rates with direct labor-hours as the allocation base in Assembly and machine-hours as the allocation base in Fabrication, how much manufacturing overhead would be applied to Job Bravo?
(Round your intermediate calculation to 2 decimal places.)