Reference no: EM132596626
Wilmington Company has two manufacturing departments--Assembly and Fabrication. It considers all of its manufacturing overhead costs to be fixed costs. The first set of data that is shown below is based on estimates from the beginning of the year. The second set of data relates to one particular job completed during the year--Job Bravo.
Estimated Data Assembly Fabrication Total
Manufacturing overhead costs $3,960,000 $4,400,000 $8,360,000
Direct labor-hours 110,000 66,000 176,000
Machine-hours 44,000 220,000 264,000
Job Bravo Assembly Fabrication Total
Direct labor-hours 23 15 38
Machine-hours 15 18 33
Required:
Question 1. If Wilmington used a plantwide predetermined overhead rate based on direct labor-hours, how much manufacturing overhead would be applied to Job Bravo?
Question 2. If Wilmington uses departmental predetermined overhead rates with direct labor-hours as the allocation base in Assembly and machine-hours as the allocation base in Fabrication, how much manufacturing overhead would be applied to Job Bravo?