Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
How much extra water does a 21.5 ft, 175-lb concrete canoe displace compared to an ultra-lightweight 38-lb Kevlar canoe of the same size carrying the same load?
Link ABrotates through a limited range of angle β, and its end Acauses the slotted link ACto rotate also. For the instant represented where β= 60 and = 0.6 rad/sconstant, determine the corresponding value of r r'.
The fire department proposes to approach the truck from the upstream side and heavily spray the truck with water to prevent an explosion. Will this help to reduce the chlorine concentration downstream?
A four year financial project has net cash flows of $20,000; $25,000; $30,000; and $50,000 in the next four years. It will cost $75,000 to implement the project. If required rate of return is 20%, conduct a discounted cashflow calculation
Determine if a simple supported W 12x26 (A36 steel) beam has the capacity to support loads that produce 50 kips of live-load shear and 20 kips of dead-load shera.
Activity Description Duration Immediate Predecessors ST Start milestone - Activity Description duration Inmdiate predesesor ST Start milestone - - A excavate st. 1 4 ST B Order & steel del. work 7 ST C Formwork st.
A sample of aggregates weighs 400 grams. After drying at 112oF, its weight was 398.5 grams and absorption is 10%. Determine the moisture content and the free moisture.
Assume that an egg can be hatched only in the week after it is laid. Otherwise it must be saved and sold for 10 cents. Assume that there are no eggs available for hatching in the first week.
Can a contractor claim that liquidated damages should be limited Because of political unrest, only 20% of rooms are occupied. Liquidated damages are set to $30000 per day -> reasonable amount Contractor is late 15 days.
Find the minimum length of runway required for the landing (I found to be 300ft). Find the position on the runway where the speed is 50ft/s and the time it takes for the speed to reach 50ft/s
The first pipe of 0.4-m diameter is 500 m long, the second pipe 600 m long, size 0.3 m, and the last pipe is 500 m long of diameter 0.2 m. If the elevation difference between two reservoirs is 30 m, calculate equivalent pipe size and flow in the p..
a ball is thrown with a valocity of 30 m/s at an angle of 40 degrees above the horizontal from the top of a 100m tall building. what is balls velocity when it lands. (neglect air resistance in both cases) DO NOT USE 2D projectile motions, only work ..
North City must choose between two new snow-removal machines. The SuperBlower has a $70,000 first cost, a 20 year life, and an $8000 salvage value. At the end of 9 years , it will need a major overhaul costing $19,000.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd