Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A horizontal curve on a single lane freeway ramp is 400 ft long and the design speed of the ramp is 45mi/h. If the superelevation is .10 at the station of the PC is 17+35, what is the station of the PI and how much distance must be cleared from the center of the lane to provide adequate stopping sight distance?
Footings for a structure are to be built beneath a basement slab on a clay soil at a depth of 20 ft below present ground level. The groundwater table is 15ft below the ground surface. The soil void-ratio is about 0.087.
hree wells are drilled in an unconfined aquifer with the following coordinates and observed heads: Well 1: 0,200 (meters) 50 (meters) Well 2: 240,130 54 Well 3: 140, 320 63 (a) Find the magnitude and direction of the hydraulic gradient.
Compute the ratio of the nominal flexural strength of the beam to the maximum service load moment, and compare your findings to the ACI load factors and strength reduction factor.
The ¼" thick 6061?T6 aluminum bar is subjected to a tensile force of P = 5 kips. b = 4"; c = 1.5"; d = 2.5"; and the fillet radii are 1". a) Determine the maximum stress in the bar. b) What is the lateral strain in the 1.5" wide section
Base isolation technique has become the method of choice for structural design of buildings and bridges located in highly seismic areas in recent years.
The 75 lb block is released from rest 5 ft above the plate. Determine the compression of each spring when the block momentarily comes to rest after striking the plate.
During a 108 minute long storm, the precipitation rate over a 100 acre area is 1.65 in/hr. The phi index is 0.42 in/hr. The average outflow from the area is 92 cfs during the storm. What is the value of combined detention and interception storages ..
A 1 m diameter unfinished concrete pipe (n = 0.015) has a slope of So = 0.001 and conveys water at Q = 0.5 m3/s. Find the normal depth yo and critical depth yc.
determine the width of the flume to be used such that the depth of flow immediatly upstream of the throat under design conditions is 1 m. By what percentage is the capacity of the flume reduced if the downstream depth is 0.85m
The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..
The spillway for a dam is 20 m wide and is designed to carry 125 m3/s at flood stage. A 1:15 ratio model is constructed to study the flow characteristics through the spillway. The effects of surface tension and viscosity can be neglected.
A 5000 m3/day wastewater treatment plant discharges to a river with a minimum drought flow of 140 m3/min (upstream of outfall) a)What total allowable BOD (kg/day) could be discharged by the plant if the BOD in the river after initial dilution must ..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd