The typical subway station in Washington, DC, has six turnstiles, each of which can be controlled by the station manager to be used for either entrance or exit control-but never for both. The manager must decide at different times of the day how many turnstiles to use for entering passengers and how many to use for exiting passengers. At the George Washington University (GWU) Station, passengers enter the station at a rate of about 84 per minute between the hours of 7 a.m. and 9 a.m.
Passengers exiting trains at the stop reach the exit turnstile area at a rate of about 48 per minute during the same morning rush hours. Each turnstile can allow an average of 30 passengers per minute to enter or exit. Arrival and service times have been thought to follow Poisson and negative exponential distributions, respectively. Assume riders form a common queue at both entry and exit turnstile areas and proceed to the first empty turnstile.
The GWU station manager, Gerald Aase, does not want the average passenger at his station to have to wait in a turnstile line for more than 6 seconds, nor does he want more than 8 people in any queue at any average time.
a) How many turnstiles should be opened in each direction every morning?
b) Discuss the assumptions underlying the solution of this problem using queuing theory.
Explain what is the terminal cash flow in year 10 (what is the annual after-tax cash flow in year 10 plus any additional cash flow associated with termination of the project)?
project management processes in organizationseach student in the group should select one category of barrier and
Top Employer Ratings for Compensation and Benefits
learning outcomes assessedthis assignment will summative assess the following learning outcome it should be able to
Identify and comment on personal experiences where some activity fell
A company is planning for its financing needs and uses the basic fixed-order quantity inventory model. Which of the following is the total cost (TC) of the inventory given an annual demand of 10,000
In spite of their poor cost performance, why do you think these projects were supported to their conclusion? What would it take to kill a high-visibility project such as these?
On the date of the grant, the L&M stock sells for $30 per share. On December 31, 2008, the stock sells for $40; it sells for $50 on December 31, 2009, and for $55 on Decem- ber 31, 2010. Jasmine exercises the SARs on December 31, 2010. When does s..
evaluation form after project termination for effectiveness of the project manager.design an evaluation form to be used
cost and time methodsas a project manager discuss the cost and time methods you would chose to work with and why you
Establishment of the City Depot on the banks of James river by General Ulysses G. Grant in 1864 during American Civil War
Examine the team building techniques found in the PMI article titled "Team Building and Development in a Matrix Environment"
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd