How many hours should it take an articulated wheel loader

Assignment Help Civil Engineering
Reference no: EM13540147

How many hours should it take an articulated wheel loader equipped with a 4 yd bucket to load 3000 cu yd of gravel from a stockpike into rail cars if the average haul distance is 300 ft one way? The area is level with a rolling resistance factor of 120lb/ton Job efficiency is estimated at 50min/hr.

Reference no: EM13540147

Questions Cloud

Determine the magnitude and direction of the shear stress : Crude oil, with specific gravity SG=0.85 and viscosityμ = 2.15×10−3 lbf sec/ft2, flows steadily down a surfaceinclined θ = 30 degrees below the horizontal in a film ofthickness h=0.125 in. The velocity profile is given by u =ρg/μ(hy − y2/2)sinθ
What is the largest rectangular interior room that can be : Matt is building a stand made out of mud bricks ( ultimatecompressive strength approximately 100 psi and density 250lbs/cubit foot) in the shape of a tent
What do they estimate thhe acceleration due to gravity to be : In an experiment to estimate the acceleration due to gravity,a student drops a ball at a distance of 1m above the floor. His labpartner measures the time it takes to fall and obtains an estimateof 0.46s.
How long does it take to reach an altitude of 3000m : Missiles designed for defense against ballistic missiles haveattained accelerations in excess of 100g's or 100 times theacceleration due to gravity. Suppose that the missile
How many hours should it take an articulated wheel loader : How many hours should it take an articulated wheel loader equipped with a 4 yd bucket to load 3000 cu yd of gravel from a stockpike into rail cars
What will be the discharge : A concrete sewer pipe 1m in diameter is laid so it has a drop in elevation of 30cm per 300m of length. If sewage (assume the properties are the same as those of water) flows at a depth of 50cm in the pipe, what will be the discharge?
What power output may be expected from the turbine : If the discharge is 500cfs, what power output may be expected from the turbine? Assume that the turbine efficiency is 90% and that the overall head loss is 1.5V 2/2g, where V is the velocity in the 7 ft penstock. Assume a=1.0 at all locations.
The ratio of volumetric strain to diametral strain is : A w24x192 of a242 steel is to be used as a beam. what are the values of yield stress Fy ultimate tensile stees Fu and modulus of elasticity E for this beam?
What are the possible water levels in the tank at the end of : A cylindrical tank is used to store water for a town. on any given day, the water supply inflow per day may fill the tank with additional 6, 7, or 8ft of water

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the maximum power output of the pelton wheel

The Pelton wheel is 3.0 m in diameter, and the nozzle exit is 0.2 m in diameter. Determine the maximum power output of the Pelton wheel. Is a Pelton wheel the appropriate turbine type for this application

  With what velocity will air enter room under laboratory door

Laboratories containing dangerous materials are often kept at a pressure slightly less than ambient pressure so that contaminants can be discharged through an exhaust system rather than leaked through cracks and around doors to other parts of the ..

  State difference in bishop and fellenius method of slices

State the basic difference between the general method of slices and the bishop method of slices. b.)State the basic difference between the bishop and fellenius method of slices

  What is the ultimate bod of the completely mixed wastewater

You add 100 mg/L of glucose to pure water, then decide that this was a mistake and decide to remove it biochemically before you serve the water to your friends at a cocktail party. To remove the glucose, you seed the water with a harmless bacteria..

  Define energy transfer in mechanical systems

Energy transfer in mechanical systems, A wheel is 800mm in diamiter and has a mass of 1000kg. on a horizontal surface without skidding, the vehicle accelerates uniformly at 0.5m/s^2 for 5 seconds.

  What rate of return did the company make on the process

Barron Chemical uses a thermoplastic polymer to enhance the appearance of certain RV panels. The initial cost of one process was $130,000 with annual costs of $49,000 and revenues of $78,000 in year 1, increasing by $1000 per year.

  How to determine the rating curve of the spillway

Consider a 75-ft wide overflow spillway with no piers and a design head of 18 ft. The crest elevation of the spillway is 2400 ft and the streambed elevation just upstream of the spillway is 2350 ft.

  Find what is the future worth at 15 years of the investment

general price inflation is estimated to be 3% for the next 5 years, 5% the 5 years after that, and 8% the following five years. If you invest $10,000 at the market rate of 10% for those 15 years,

  Determine what will be the discharge q at a depth

If sewage (assume the properties are the same as those of water) flows at a depth of 1.5ft in the pipe, what will be the discharge Q = 10.6 cubic feet/second

  Determine the critical load of a round wooden dowel

Determine the critical load of a round wooden dowel that is 0.9m long and has a diameter of (a) 10mm (b) 15mm. Use E=12GPa

  What is value of p that make work of the two processes

If this two-step process is replaced by a single isothermal expansion of the air from 800 K and 4 bar to some final pressure P, what is the value of P that make the work of the two processes the same

  Calculate the space-mean speed of these four vehicles

A radar device is installed at a location on the roadside to measure instantaneous speeds of vehicles passing that location. The initial four vehicles' speeds are listed. Calculate the space-mean speed of these four vehicles.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd