Aire-Co produces home dehumidifies at two different plants in Atlanta and Phoenix. the per-unit cost of production in Atlanta and Phoenix is $400 and $360, respectively. Each plant can produce a maximum of 300 units per month. Inventory holding costs are assessed at $30 per unit in beginning inventory each month. Current inventory is 20 units. Aire-Co estimates the demand for its product to be 300, 400, and 500 units, respectively, over the next three months. Aire-Co wants to be able to meet this demand at minimum cost.

Formulate this problem as an LP model in a spreadsheet and solve using Solver.

How many dehumidifiers should be built in Atlanta, next month? How many in Phoenix?

 

Reference no: EM13249779

Questions Cloud

Determine the magnetic force on each wire : Two parallel wires of length 18 m are separated by a distance of a = 0.13 cm. The first carries a current of I1 = 5 A, What is the magnetic force on each wire
Formulate and solve a linear programming model in excel : Formulate and solve a linear programming model in Excel to develop a work schedule that processes all checks by 8 P.M. and minimizes daily labor costs.
Explain the metathesis reaction between sodium sulfide : What is the correct balanced net ionic equation which represents the metathesis reaction between sodium sulfide and aluminum chloride
What are some of the challenges : discuss some of the aspects of the transfer of training. What are the primary factors that play a role in the success of the process? How can application of the training objectives be sustained? What are some of the challenges?
How many dehumidifiers should be built in atlanta : How many dehumidifiers should be built in Atlanta, next month? How many in Phoenix?
Automobile manufacturers design : Automobile manufacturers design and build cars/pickups to target certain segments of our society. Fill out the attached HLC/Social Stratification Matrix by suggesting an automobile or pickup truck that has been designed for that segment.
Explain the synthesis of phenylacetic acid : Carboxylic acids can be made by the hydrolysis of nitriles, which in turn can be made from an alkyl halide. Draw the structures of a starting alkyl bromide and the intermediate nitrile that would be used in the synthesis of phenylacetic acid
What is meant by the term propagation delay : What voltage levels typically define a logic 0 and a logic 1 in the newer logics today.  What are the major semiconductor technologies used in making integrated circuits today. What is the difference between sinking current and sourcing current.
Each stage in the household life cycle poses : What is meant by the statement: "Each stage in the household life cycle poses a series of problems which household decision makers must solve?

Reviews

Write a Review

Operation Management Questions & Answers

  Canned soft drinks and fruit drinks

The General Store at State University is an auxiliary bookstore located near the dormitories thatsells academic supplies, toiletries, sweatshirts and T-shirts, magazines, packaged food items, and canned soft drinks and fruit drinks.

  Estimating the process capability index

The Good Chocolate Company makes a variety of chocolate candies, including a 12-ounce chocolate bar (340 grams). The output of the machine that fills the bar molds is approximately normal with a mean of 340 grams and a standard deviation of 1.5 grams..

  What is the eoq

Demand for a popular athletic shoe is nearly constant at 800 pairs per week for a regional division of a national retailer. The cost per pair is $54. It costs $72 to place an order, and annual holding costs are charged at 22% of the cost per unit.

  Explain the best strategic planning and implementation

From some organization(s) where you have worked (or someone else has worked), write 2 scenarios from the strategic perspective as follows, Explain the BEST strategic planning and implementation.

  Elucidate how well is project doing in terms of priorities

Elucidate how well is project doing in terms of priorities. If one of industrial engineers assigned to your project would be available to work on project from Aug 22-27, 2008. Illustrate what would you tell him.

  Determine the expected number of nonconforming units

A process is in control and centered at nominal. Output from the process is normally distributed and the process capability index, Cp, equals 1.02.

  Determine the standard working time for a special job

To determine the standard working time for a special job, following observation data is collected.

  Write a marketing plan

Your cousin wants to start his own business, but he has decided not to write a marketing plan because he thinks that preparing such a document would take too long

  What is the inventory position immediately

Suppose that the store wants to consider a stockout strategy. They estimate the cost of back ordering to be $3 per unit per year. What is the optimal policy and cost of such a strategy? Show all work and draw a diagram of this policy.

  What processes at manufacturing firms are really

What processes at manufacturing firms are really service processes that involve considerable customer contact?

  What are the distinctive features of a focused low-cost

What are the distinctive features of a focused low-cost strategy? How does it differ from a low-cost leadership strategy?

  Develop an aggregate plan using a spreadsheet

Helter Industires, a company that produces a line of women's bathing suits, hires temporaries to help produce its summer product demand. For the current four-month rolling schedule

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd