By use of the Nyquist criterion, determine whether the closed-loop systems having the following open-loops transfer functions are stable or not. If not, how many closed-loop poles lie in the right half s-plane. a. GH(s) = (1+4s)/(s^2)(1+s)(1+2s) b. GH(s) = 1/(s(1+2s)(1+s)) c. GH(s) = 1/((s^2)+100)

Reference no: EM13269907

Questions Cloud

What minimal bandwidth is necessary for the monitor : A chest radiograph of 43cm x 35cm is to be viewed on a v monitor wih a resolution of 3 lp/mm. what minimal bandwidth is necessary for the monitor if the image is displayed at 60Hz non-interlaced
What is the increase in thermal energy of the floor : A horizontal force of magnitude 34.5 N pushes a block of mass 4.09 kg across a floor where the coefficient of kinetic friction is 0.609. During that displacement, the thermal energy of the block increases by 39.3 J. What is the increase in thermal ..
Define and discuss the concept of romanticism : Define and discuss the concept of "Romanticism" as it applies to the musical culture of Europe during the 19th century.
What is the bonds current price : Consider a bond paying a coupon rate of 7.75% per year semiannually when the market interest rate is only 3.1% per half-year. The bond has six years until maturity.
How many closed-loop poles lie in the right half s-plane : By use of the Nyquist criterion, determine whether the closed-loop systems having the following open-loops transfer functions are stable or not. If not, how many closed-loop poles lie in the right half s-plane.
What is the magnetic field at a point along the axis of coil : A) What is the magnetic field at a point along the axis of the coil, 0.89 m from the center B) At what distance from the center along the axis is the magnetic field magnitude 1/11 as great as it is at the center
What is the net present value of the project : The project has an initial cost of $4.3 million and produces cash inflows of $1.27 million a year for 5 years. What is the net present value of the project?
Why firms in these industries would prefer : Firms in the real estate investment trusts (REITs), airlines, electric utilities, and paper products industries tend to have high leverage. Explain why firms in these industries would prefer to have high leverage.
Find the sampling frequency and record length of signal : An analog signal, containing frequencies up to and including 400Hz, is to be sampled at the minimum possible frequency, with a frequency resolution of 0.1 Hz. You are to find the sampling frequency, record length, and number of samples.

Reviews

Write a Review

Electrical Engineering Questions & Answers

  What are the requirements for the circuit supplying

In terms of good desgn practice , what is the number of receptacles allowed on a general purpose 15 A 120V circuit. A 20A and 120V circuit. What are the requirements for the circuit supplying bathroom in residences

  Determine p-type body doping concentration na for voltage

Write an equation to help determine P-type body doping concentration Na for a required threshold voltage V (sub TN) for an N-channel Al-Sio(sub 2) -Si MOSFET. Use the equation to design an N-MOSFET with a thershold voltage of 10V

  What is the angular position v1 and v2 and v3 at 10th second

a) Draw the phasor diagram for V1, V2 and V3. b) Find out the value of V1+V2-V3 and draw the phasor diagram for it. c) If the frequency of all signals is 60Hz, then what is the angular position V1 and v2 and v3 at 10th second

  How the resistors can be fabricated to non-standard values

You must design a three axis position indicator for the latest robot arm. Using no more than two operational amplifiers, design a circuit that uses three inputs, v1, v2, and v3 to produce an output signal vo=3 v1-2 v2-5 v3.

  Find current of phase b in polar form

In a balanced three-phase system the Y-connected impedances are 3∠60°Ω. If V_bc=480∠-75° V, find current of phase "b" in polar form.

  What is the approximate rise time step response

(a) find the value of a and K so that the relative damping ratio of the system is 0.5 and the rise time step response is approximately 1 s. (b) with the values of a and k found in previous question

  What is probability that each of seeds wins championship

We will make the follwoing probability assumptions: When team A plays team B, the probability that team A wins is given by: P(A wins) = \(([seed(B)+3]^2)/([seed(A)+3]^2 +[seed(B)+3]^2) \)

  Determine impedance of the system in rectangular coordinates

An Electrical System is rated 10kVA, 200V at a .5 leading the power factor. a. determine the impedance of the system in rectangular coordinates. b. find the average power delivered to the system

  Find and plot the system zero-state response to input signal

A DT system has the unit pulse response h[nT] = (0.4)^-|n|. Find and plot the system zero-state response to the input signal x[nT] = u[(n+2)T] + u[(u-2)T]

  Find the minimum-cost sop expression for the function

Model and simulate a 4-to-1 multiplexer using (a) Dataflow Modeling, (b) Behavioral Modeling, and (c) Structural Modeling. Use Modelsim and a VHDL test bench to simulate all the three models for a 4-to-1 multiplexer.

  Determine the force per unit length on the conductor

A current sheet with K =10ax A/m lies in free space in the z =2m plane. A filamentary conductor on the x-axis carries acurrent of 2.5A in the axdirection. Determine the force per unit length on the conductor.

  How many pulses are needed from the controller every second

A 3-Phase stepping motor is to be used to drive a linear axis for a robot. The motor output shaft will be connected to a screw thread with a screw pitch of 5 mm. We want to be able to have a spatial control of at least 0.1 mm.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd