Macon was a fifty-year-old company in the business of developing test equipment for the tire industry. The company had a history of segregated departments with very focused functional line managers. The company had two major technical departments: mechanical engineering and electrical engineering. Both departments reported to a vice president for engineering, whose background was always mechanical engineering. For this reason, the company focused all projects from a mechanical engineering perspective. The significance of the test equipment’s electrical control system was often minimized when, in reality, the electrical control systems were what made Macon’s equipment outperform that of the competition.

Because of the strong autonomy of the departments, internal competition existed. Line managers were frequently competing with one another rather than focusing on the best interest of Macon. Each would hope the other would be the cause for project delays instead of working together to avoid project delays altogether. Once dates slipped, fingers were pointed and the problem would worsen over time.

One of Macon’s customers had a service department that always blamed engineering for all of their problems. If the machine was not assembled correctly, it was engineering’s fault for not documenting it clearly enough. If a component failed, it was engineering’s fault for not designing it correctly. No matter what problem occurred in the field, customer service would always put the blame on engineering.

As might be expected, engineering would blame most problems on production claiming that production did not assemble the equipment correctly and did not maintain the proper level of quality. Engineering would design a product and then throw it over the fence to production without ever going down to the manufacturing floor to help with its assembly. Errors or suggestions reported from production to engineering were being ignored. Engineers often perceived the assemblers as incapable of improving the design.

Production ultimately assembled the product and shipped it out to the customer. Oftentimes during assembly the production people would change the design as they saw fit without involving engineering. This would cause severe problems with documentation. Customer service would later inform engineering that the documentation was incorrect, once again causing conflict among all departments.

The president of Macon was a strong believer in project management. Unfortunately, his preaching fell upon deaf ears. The culture was just too strong. Projects were failing miserably. Some failures were attributed to the lack of sponsorship or commitment from line managers. One project failed as the result of a project leader who failed to control scope. Each day the project would fall further behind because work was being added with very little regard for the project’s completion date. Project estimates were based upon a “gut feel” rather than upon sound quantitative data.

The delay in shipping dates was creating more and more frustration for the customers. The customers began assigning their own project managers as “watchdogs” to look out for their companies’ best interests. The primary function of these “watchdog” project managers was to ensure that the equipment purchased would be delivered on time and complete. This involvement by the customers was becoming more prominent than ever before.

The president decided that action was needed to achieve some degree of excellence in project management. The question was what action to take, and when.

QUESTIONS

1. Where will the greatest resistance for excellence in project management come from?

2. What plan should be developed for achieving excellence in project management?

3. How long will it take to achieve some degree of excellence?

4. Explain the potential risks to Macon if the customer’s experience with project management increases while Macon’s knowledge remains stagnant.

Reference no: EM131279907

Questions Cloud

About to install information systems : A CEO of a company heard about your qualifications as an IS consultant, and approached you for advice. He told you that he is about to install information systems in the company, and he had a good candidate for heading this activity. This candidate w..
Exists between organization and its operating environment : What is so interesting about the Bamiyan Buddhas and their artistic styles which developed along the Silk Road? Analyse the relationship that exists between the organization and its operating environment.
What evidence you would use to help prove your point : You have a friend who is of Jewish heritage; however, she has no religious belief. She asks you why, if God is good, He permitted the Holocaust to happen. What would you tell her? You are writing an article for a theological journal arguing that heav..
Under what circumstances should international business : Under what circumstances should international business people impose the values of their culture on foreigners with whom they do business? What are two primary sources of information on a given country’s culture? Outline why the culture of a country ..
How long will it take to achieve some degree of excellence : Macon was a fifty-year-old company in the business of developing test equipment for the tire industry. The company had a history of segregated departments with very focused functional line managers. The company had two major technical departments: me..
Determine the equation for the unit formulation : Given the following information, determine the equation for the unit formulation.
Signed a revenue- sharing contract : Topgun Records has signed a revenue- sharing contract with a movie studio for CDs. Each CD costs the studio $2 to produce. How many CDs should Topgun order? How many CDs does Topgun expect to sell at a discount? What is the profit that Topgun expects..
What is the expected overstock at the retailer : Benetton has a quantity flexibility contract with a retailer for a seasonal product. If the retailer orders O units, Benetton is willing to provide up to another 35 percent if needed. Benetton’s production cost is $20 and it charges the retailer a wh..
Decided that concession sales will support themselves : As a manager of the St. Cloud Theatre Company, you have decided that concession sales will support themselves. The following table provides the information you have been able to put together thus far: Last year manager Jim Freeland has advised you to..

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd