How long will it take for the concentration to be one-quarte

Assignment Help Civil Engineering
Reference no: EM13550421

1.Upstream of a discharge point, a stream has a discharge of 400 cfs and a BOD5 of 12.5 mg/L. A pipe discharges 150 gpm of water containing 120 mg/L of BOD5. What is the downstream BOD5?

2.A batch system is assumed to be first order. The initial concentration is 225 mg/L. If the reaction rate constant is 0.65 hr^-1, how long will it take for the concentration to be one-quarter the starting concentration?

3.If 5 mg of NaOCl are added to one liter of water and the pH is measured to be 7.8, what is the concentration of hypochlorite ion (OCl-) in mg/L?

4.Apoint charge of -4.00 nC is located at (0,1.00) m . what is the x component of the electric field due to the point charge at (4.00, - 2.00) m ?

Reference no: EM13550421

Questions Cloud

Determine the maximum moment that can be carried : Find the nominal flexural strength from part (d.) to the service capacity from part (c.). e.) Compute the ratio of the flexural strength from part (d) to the service capacity from part (c).
Calculate the height of the model : An ogee spillway of a gravity dam is to be modeled using water. The spillway section is 40 feet high, its crest length is 60 feet and the maximum discharge is 3,000 CFS when the head on the crest of the spillway is 5 feet. Using a model scale of 1:10..
Proof that it follows from the solution obtained that : Find the particular solution for a = 4 subject to the initial conditions y(0) = 0, dy/dt = 1 m/s at t = 0. Plot this solution and determine the largest displacement of the mass using calculus.
Determine the carburizing time necessary to achieve a carbon : Determine the carburizing time necessary to achieve a carbon concentration of 0.35 wt% at a position 2 mm into an iron–carbon alloy that initially contains 0.10 wt% C
How long will it take for the concentration to be one-quarte : A batch system is assumed to be first order. The initial concentration is 225 mg/L. If the reaction rate constant is 0.65 hr^-1, how long will it take for the concentration to be one-quarter the starting concentration?
Determine the reaction rate constant : A reaction in a batch system is assumed to be first order. Data listed below was collected. Determine the reaction rate constant.
Calculate the mass flux rate and the flow rate : During a drilling operation, the small robotic device is subjected to an (F =) 900 N force at point C as shown. (? = 25°.) Replace this force by an equivalent force-couple system at point O.
What is the deflection of the manometer : A grain-size analysis for a uniform sand in a loose state indicated that the soil particle diameter corresponding to 10% passing on the grain-size distribution curve is 0.18 mm. Estimate the coefficient of permeability.
Estimate the power in watts that can be produced : An Engineer is considering the development of a small wind turbine (D=1.25m) for home applications. The design wind speed is 15 mph at T=10C and p=0.9 bar. The efficiency of the turbine is n=20% meaning that 20% of the kinetic energy in the wind can ..

Reviews

Write a Review

Civil Engineering Questions & Answers

  How many years would this supply a city of 100000 people

A reservoir has a capacity of 2.75 million acre-ft. How many years would this supply a city of 100,000 people if evaporation is neglected. Assume a use rate of 180 gpcd.

  Find the flow rate if the pump puts 22 hp in to the flow

A 110 f t long, 5 in in diameter (f = 0:033) connects two reservoir whose water surface elevations differ by 12 f t. Compute flow rate in pipe.

  Derive equation for the torque in terms including resistance

A movable cone fits inside a stationary conical depression. If a torque is applied to the cone, the cone will rotate at a certain speed depending on the angles θ and β, the radius r o, and the viscosity μ of the liquid.

  Note the wide u-shaped profile of the upper outer portion

1 were the designers aware that this valley was landslide-prone before they built the dam? what feature of fig. 1

  Determine what speed will sleeve attain if force is applied

A Newtonian fluid is in the clearance between a shaft and a concentric sleeve. When a force of 600 N is applied to the sleeve parallel to the shaft, the sleeve attains a speed of 1 m/s. If a 1500 N force is applied, what speed will the sleeve atta..

  How to estimate the ultimate total settlement

The settlement analysis for a proposed structure indicates that 6cm of settlement will occur in 4 yr and that the ultimate total settlement will be about 25cm. estimate (a) the ultimate total settlement and ..

  Determine the maximum bending stress in the strap

An L2 steel strap having a thickness of 0.125 in. and a widthof 2 in. is bent into a circular arc of radius 600 in. Determine the maximum bending stress in the strap.

  Determine the minimum weight of the bucket that will prevent

A rectangular channel of 20 f t width and having n = 0.017 carries flow of 800 f t^3/s. Calculate (a) critical depth (b) the minimum speci c energy (c) the speci c energy when depth of flow is 7 f t. What type of flow exists when the depth is (d) 2 f..

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Compute the max possible moment at the centerline

compute the max possible moment at the centerline of the beam and the absolute moment in the beam.

  Find what is the stretch of the 360 cable under the load

What is the maximum load that a .75" diameter steel cable can hold if the UTS of the steel is 145,000 PSI and a safety factor of 1.5 is required.What is the stretch of the 360" cable under this load

  Depict a decision tree

The mine's operating costs were projected at $900,000 per year including $400,000 of fixed costs and $500,000 of variable costs. Ms. Peru thought these forecasts accurate.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd