How long in hours will it take to reduce the concentration

Assignment Help Civil Engineering
Reference no: EM13314204

One way to treat amd is to treat the metals in a holding pond. The first order rate constant is 10/day. The concentration in the water must be below 5 ppm. How long in hours will it take to reduce the concentration from 250 ppm to 5 ppm? Assume no flow in or out

Reference no: EM13314204

Questions Cloud

What is the total charge on the interior : A charge +7.4 %u03BCC is placed at the center of the hollow spherical conductor with the inner radius 3.2 cm, What is the total charge on the interior
Find the angular acceleration of the merry-go-round : A merry-go-round starts from rest and accelerates uniformly over 11.0 s to a final angular velocity of 7.50 rev/min, Find the angular acceleration of the merry-go-round
Determine the present worth for physical asset investment : Inital Cost=$40,000, Estimated Salvage Value (@ year 5)=18,000, Actual Salvage Value (@ yr.5)=20,000, Depreciation: Straight-Line (No half -year convention), Life=5yrs, Annual Benefit=10,000, and tax rate=34%.
Is it important to include a policy that outlines the origin : Why is it important to include a policy that outlines the origin and scope of purchasing authority? What might happen if such a policy did not exist?
How long in hours will it take to reduce the concentration : One way to treat amd is to treat the metals in a holding pond. The first order rate constant is 10/day. The concentration in the water must be below 5 ppm. How long in hours will it take to reduce the concentration from 250 ppm to 5 ppm
What is the drivers average velocity : A driver travels 10 km east, 20 km north and 50 km in a direction 30 degrees south of west. What is the drivers average velocity if the trip takes 90 minutes
At what distance will the concentration of metals be 5 ppm : Assume the stream is 3ft wide and 1ft deep (assume a rectangular cross section. If the flow throught the stream is 1000 gallons/day and the concentration at the beginning of the stream is 250 ppm
Compute the speed of the skater : A 75kg skater starts his skate at 4m above ground, the horizontal distance to the bottom of the track is 6m. Calculate the speed of the skater at the bottom of the track
Explain why custom officers,exporters,importers,carriers : Explain why custom officers,exporters,importers,carriers and shippers must have some knowledge or training on dangerous goods?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Locate the image using both the spherical mirror equations

Locate the image using both the spherical mirror equation and a ray diagram and identify if it is real or virtual, upright or inverted, and smaller or larger.

  Magnitude of shaft work obtained from the turbine

If the amount of heat transfer in the HE unit is 2460 kJ per kg of steam, what is the magnitude of shaft work obtained from the turbine in kW?

  Determine its velocity for t along a straight line

A particle moving along a straight line is subjectd to a deceleration a=(-2v^3)m/s^2 where v is in m/s. If it has a velocity v=8 m/s when t=0, determine its velocity when t=4s.

  What rate of return would it have to make on the basis of si

Farah Manufacturing wants it's investments to double in value in 4 years, what rate of return would it have to make on the basis of (a) simple interest (b) compound interest

  Determine the maximum water hammer pressure in pipeline

A gate valve is located at the end of the pipe. If the valve is closed suddenly, determine the maximum water hammer pressure that will develop in the pipeline. The water level in the reservoir is 98.4 ft above the outlet.

  Determine what length of new pipe is needed

a buried horizontal concrete pipe (n=0.012) of unknown length needs to be replaces. the length is not known because the original plans for the pipeline route have been lost. the pressure head drop along the segment that needs to be replaced is 29...

  Design continuous slab showin using aci moment coefficients

The slabs are to be built integrally with the end supports, which are spandrel beams. fy = 60,000 psi, fc' = 4000psi normal-weight concrete. Clear spans are 15 feet, 18 feet and 15 feet. with the longitudal span of 38 feet.

  Determine the minimum necessary clearance height

Determine the minimum necessary clearance height of the overpass and the resultant elevation of the bottom of the overpass over the PVI. (ignore the cross-sectional width of the overpass)

  List the volcanic hazards associated with shield volcanoes

You have been hired to plan and build a subdivision on the volcanic island of Hawaii. As you know, this island is made of several shielf volcanoes. A) List the volcanic hazards associated with shield volcanoes.

  Estimate the maximum number of cars per hour as a function

Estimate the maximum number of cars per hour that can travel down two lanes of a highway as a function of speed (ie at 50, 60 , and 70 mph) .for safety purposes the cars must be spaced one car length apart for each 10 mph they are traveling.

  How to specify the number of plates that can be stored

A plate storage system for a self-serve salad bar in a restaurant. As plates are added to or withdrawn from the stack, the spring force and stiffness are such that the plates always protrude above the tabletop by about 60 mm.

  What is the waters temperature at the exit of the turbine

A turbine operates at steady state with steam flowing through it at a rate of 36 kg/min. The steam enters the turbine at a temperature of 600C and a pressure of 8 MPa and exits at a pressure 90% lower with a quality of 70%.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd