How high can the hump be made without backing flow up

Assignment Help Civil Engineering
Reference no: EM13299435

A long rectangular channel 12 ft wide is laid on a slope of 2.22 ft per 10,000 ft. The channel has an n-value of 0.016 and carries 352 cfs of water at a normal depth of 9 ft. A smooth hump is placed in the bottom of the channel. What would be the depth of flow over a 3 ft high jump. How high can the hump be made without backing flow up? What would be the depth of flow over and just upstream of a 6 ft high jump?

Reference no: EM13299435

Questions Cloud

Find the speed of the arrow : A soldier has a huge contraption that notches a large 3 kg arrow (it looks more like a lance) in a massive bow, What is the speed of the arrow
Draw a footing detail showing all pertinent design parameter : design a square individual footing to support a 16 inch square reinforced concrete column. service loads include a dead load of 180 kips and a live load of 140 kips. both column and footing have fc=3000psi and fy=60000 psi.
Compute the cash collections from sales for each quarter : The beginning accounts payable balance is $72 million. Assuming all sales are on credit, compute the cash collections from sales for each quarter.
Find how much work is done on the rail car : A rail car that weighs 40 N is accelerated at 6.9 m/s/s for 4.9 seconds. How much work is done on the rail car
How high can the hump be made without backing flow up : A smooth hump is placed in the bottom of the channel. What would be the depth of flow over a 3 ft high jump. How high can the hump be made without backing flow up What would be the depth of flow over and just upstream of a 6 ft high jump
What is the speed of the moving cart before the collision : A 206 kg cart runs into the rear end of a 102 kg cart that is stationary. What is the speed of the moving cart before the collision
Compute the present value of this stream of income : Now compute the present value of the income stream from the gold mine at a discount rate of 6%, and at a discount rate of 4%.
What are the cash flows to tom under each scenario : The company needs a cash infusion of $1.5 million, and it can issue equity or issue debt with an interest rate of 9 percent. Assume there are no corporate taxes.
Evaluate the distance between the charges : Two point charges of equal mass start from rest. What is the distance between the charges and How long will it take the charges to move

Reviews

Write a Review

Civil Engineering Questions & Answers

  How to determine the grade of the road of an object

A driver is travelling at 50 mi/h on a wet road. An object is spotted on the road 500 ft ahead and the driver is able to come to a complete stop just before hitting the object.

  Bidding for the project assignment

Should Bernard bid for the project assignment? Why or why not? Does Bernard have an unfair advantage over firms having designed the project on which he wants to bid?

  Determine ratio for which material cost per pound of ethyle

Ethyl acetate is made from acetic acid and ethyl alcohol. Let x = pounds of acetic acid input, y=pounds of ethyl acohol input, and z = pounds of ethyl acetate output. The relationship of output to input is: z^2/(1.47x - z)(1.91y - z) = 3.9.

  Superelevation rate for a roadway

What superelevation rate would you recommend for a roadway with a design speed of 100 km/hr and a radius of curvature of 500 m? Assume f = 0.11.

  Write a balanced net equation for the reaction

Write a balanced net equation for the reaction of the hydrogen ascorbate anion with water where hydrogen ascorbate acts as an acid.

  Determine diameter of glass tubing for the capillary rise

Determine the diameter of glass tubing that is necessary for the capillary rise to be less than 0.5 mm. Assume the fluid is water with surface tension equal to 0.0728 N/m and specific weight equal to 9800 N/m3

  Compute the radius of the curve

A simple curve has a central angle of 42degreess. A point Y is located 24m from the vertex and has a perpendicular distance of 3.00m from the back tangent.

  Determine the expected speed of prototype to ensure numbers

A model of a submarine, at 1:15 scale, is to be tested at 0.8 ft/s in a wind tunnel at standard at mospheric pressure, while the prototype will be operated in seawater. Both the air and water are at 10 C (50 F).

  Calculate manning coefficient n for the given reach

The following data are obtained for a particular reach of the Provo river in Utah: cross sectional area A = 183 ft2, free surface width = 55 ft, average depth = 3.3 ft, Rh = 3.32 ft, V = 6.56 ft/s, length of the reach = 116 ft, and elevation drop ..

  Determine the specific volume of the exit stream

A stream of Refrigerant-134a at 1 MPa and 12 C is mixed with another stream at 1 MPa and 60 C. If the mass flow rate of the cold stream is twice that of the hot one, determine the specific volume of the exit stream.

  Find what is the range of the values that would be expected

a spot speed study was conducted on a freeway on which the mean speed and the standard deviation were found to be 72 .4 mi/hr and 5.4 mi/hr, respectively. what is the range of the values that would be expected to contain the middle 95 percent of s..

  What are the coordinates of the point

An agronomist wants to measure the rainfall at the centroid of a plowed field between two roads. What are the coordinates of the point where the rain gauge should be placed?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd