Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
an airplane flies 170km from an airport in a direction of 240 degrees. how far west of the airport is the airplane then? how far south?
The bucket is filled with 38 lb of water and is pulled up at a rate of 5 ft/sec, but water leaks out of the bucket at a rate of 0.4 lb/sec. Find the work done in pulling the bucket to the top of the well.
Two minor league baseball players got a total of 336 hits. Washington had 6 more hits than Sanchez. find the number of hits for each player.
A cylindrical can is to hold 4pi cubic units of juice. The cost per square unit of constructing the metal top and bottom is twice the cost of constructing the cardboard side. What are the dimensions of the least expensive can?
Franklin has $2,500 in a savings account that pays interest at the rate of 4% annually. How much interest will he earn after one year?
libay sold a painting for php 3125 if she earned php 5000 profit,what was the original price of the painting ?
the base of a sloping wall and reaches 14 feet up the face of the wall what is the angle of inclination of the ladder ?of the wall?
The DNA molecule has the shape of a double helix. The radius of each helix is about 8 angstroms (1Å = 10-8 cm). Each helix rises about 33 Å during each complete turn, and there are about 2.9 108 complete turns. Estimate the length of each helix. (..
A rectangular city park has a jogging loop that goes along a length, width, and diagonal of the park. To the nearest yard, find the length of the jogging loop, if the length of the park is 125 yards and its width is 75 yards.
The total cost of the fencing along three sides comes to $2130. What are the lot's dimensions?
An irrigation sprinkler in a field of lettuce sprays water over a distance of 25 feet as it rotates through an angle of 155°. What area of the field receives water? If necessary, round the answer to two decimal places.
What % of the total accounts receivable is over 90 days?
Solve the problem of Critical Path and PERT. A PERT project has 45 activities, 19 of which are on the critical path. The estimated time for the critical path is 120 days. The sum of all activity variances is 64, while the sum of variances along the..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd