Reference no: EM13229053
1 - You are in charge of organizing an annual Convention + Exhibition for a professional society for IT industry. Assume about 5000 attendees & 200 exhibitors. Please identify all tasks involved, strategies you need to adopt, prepare a complete WBS, Gantt Chart, and financials for all activities including preparations for such an event to propose to your management for funding. You can assume your own rate of fees or estimated costs involved; I am looking at methodology rather than a number!
2 - You have been appointed as a Project Manager in charge of security setup and operation of a 12-story government credit union & office complex unit. For design and implementation of a successful Disaster Recovery Plan for this building, what elements of concern you need to plan for, and what new/modified internal organizational structure you recommend to take place at the time of emergency or any disaster mishap?
3 - To deliver a project at the most economically sound budget, can you name areas of concern that you can reduce the costs before embarking onto a "J" form curve/zone of your time-line plan?
4 - How do you plan in budgeting for Risks, factoring affected tasks in a project, and suggest the process for payment of appropriate costs to be reimbursed by procurement department?
5 - For an established office building, you are assigned as a PM to plan for installation of the following systems to renovate the building by delivering a "Green Structure". You have selected different sub-contractors to perform their identified tasks during the estimated times specified for them. Please plan the best and shortest time you suggest to complete the job? Please show the best start & finish schedules of work for each subcontractor to produce minimum slack, by showing the activities on a Gantt Chart.
- Solar Panel installation & necessary circuitry 6 working days
- Changing windows 12 " days
- Modify HVAC system & internal coil to take
- Change all electrical bulbs to LED lighting 4 " days
- Complete painting job of the office 10 " days
What is the distribution of the waiting time
: which serves both types of customers and the service times follow exponential distribution with a mean of 10 minutes. if a type 2 arrives and the type 1 being served, what is the distribution of the waiting time for this time 2 customer?
|
State remain the same with the addition of potassium iodide
: Does the molar solubility of lead(II) iodide increase, decrease, or remain the same with the addition of potassium iodide to the solution? Explain
|
What percentage of accounts are savings or opened
: In a bank, among the accounts opened before 2005, 40% are saving accounts, 20% are chequing accounts and rest are mutual fund accounts. These numbers for accounts opened on or after 2005 are: 30% saving accounts,
|
Compute the equilibrium constant at 500 k
: The free energy change Delta Gt at 500 K is equal to 9.8x10^4 J/mol. Calculate the equilibrium constant at 500 K.
|
How do you plan in budgeting for risks
: How do you plan in budgeting for Risks, factoring affected tasks in a project, and suggest the process for payment of appropriate costs to be reimbursed by procurement department?
|
Find the transfer function and resolution
: find the transfer function and resolution for a 10-turn, 4.7k potentiometer with 3450 degrees of rotation and a 0 to 5 volt output. calculate the resolution in ohms per volt
|
Explain what is the value of g o at the temperature
: The equilibrium constant for a reaction is 0.48 at 25 o C. What is the value of ?G o at this temperature?
|
Determine the power components of the combination
: determine the power components of the combination of three individual loads specified as follows: (Load 1)250VA and pf = 0.5lagging; (Load 2) 180 W and pf=0.8 leading; (load 3) 300VA and 100Ar lagging
|
Identify how the issues of due process
: identify how the issues of due process and just cause are linked to employer disciplinary actions.
|