How did you feel running the change management project

Assignment Help Project Management
Reference no: EM133623003

Assignment: Project Management

Every company goes through change. Sometimes there's little change, and sometimes change comes quite often. If we had to point to one area of a company that seemingly is constantly changing, it would be the Information Systems Department. This comes as no surprise as technology is constantly changing, be it systems, networks, phones, etc. And to stay competitive, companies must change and adopt new technologies.

But change can be difficult. Often there is internal resistance and therefore we need to get buy-in and acceptance for the project to complete successfully. Because most change happens via the Information Technology (IT) department, they often find themselves as "change agents", that is, IT has to run the project while implementing new systems. Because of this, we are now introducing you to a change management simulator where you will be leading a change management project.

The simulation attempts to capture both the complexity and dynamic unfolding of events associated with large-scale change. To be successful, you have to figure out how to move the organization through three fundamental, organization-level change phases: (i) mobilization, (ii) movement, and (iii) sustain. To do so, you must seek to influence nineteen key stakeholders, or change targets (mostly members of the top management team), through four individual-level change stages: (i) awareness, (ii) interest, (iii) trial, and (iv) adoption Some of the change targets are receptive to change, while others are not. Finally, you must determine the proper usage and timing of the eighteen change levers available to you in the simulation. The impact of a lever depends on the urgency of the situation, the power and credibility of the change agent, the network position of the change target, and the phase of the organizational change process. With each round of play, you receive feedback about the impact of your lever choices on the change agent's organizational-level change, individual-level change, and personal credibility. All of this is incredibly important when either being on a project team, or being a project manager.

1) There are 4 scenarios to complete. You must complete scenario one before you can move on to scenario two, and so on.

2) Review all the documents within the simulator before proceeding with the simulation.

As you go through the 4 scenarios in the simulator, take notes, maybe even screen shots. When you have finished all 4 scenarios, create a 3 to 5 pages change management reflection paper describing:

Question 1) How did you feel running the change management project?

Question 2) Compare your results from the 4 scenarios. Which scenarios were you successful? Why? Did you have any failed scenarios? Why?

Question 3) What worked and what did not work?

Question 4) Were there any common missteps?

Question 5) Did you take time to diagnose and strategize before you began to act?

Question 6) What was your experience with the simulator? Did you like it, dislike it?

Question 7) Do you feel more or less prepared to run a project of change now?

Reference no: EM133623003

Questions Cloud

What is the main topic the researchers are discussing : What is the main topic the researcher(s) are discussing? What are the main arguments? What are the main findings of the research?
Relationship between lmx and transformational leadership : BUSI 701- Construct a paragraph discussing three sources as it relates to the topic of discussing the relationship between LMX and Transformational Leadership.
History of progressive hearing loss : Sierra simonson-walker 61 year old woman presented with left ear discharge with some bleeding sierra has 4 year history of progressive hearing loss in left ear
Acetaminophen is administered with alcohol : Is an increased risk factor when acetaminophen is administered with alcohol, isoniazid, rifampin, rifabutin, phenytoin, barbiturates, and carbamazepine.
How did you feel running the change management project : How did you feel running the change management project? What was your experience with the simulator? Did you like it, dislike it?
Initial dose of new medication : This action should be taken first since this is the initial dose of a new medication. It is important to verify any allergies.
Public Readiness and Emergency Preparedness Act : Describe history for Public Readiness and Emergency Preparedness (PREP) Act as well as how it impacts the delivery of health care services today.
How can having dimension in your analysis benefit current : Discuss the aspect of modularity in conjunction with the market analysis. How can having this dimension in your analysis benefit current and future customers?
Comprehensive from focused health history : Define and differentiate a comprehensive from a focused health history. What are its' indications.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd