How did this affect the quality management of the project

Assignment Help Operation Management
Reference no: EM131716311

Instructions: Each question has to be; coherent and cohesive, a minimum of 200 word answer for each question and you have to cite one sources. Make sure your number each answer that goes with the question. This is a Project Quality Management Class.

DS1 Chp14

1. What advantage is gained when you have a totally integrated set of processes? Describe a project you have worked on with an integrated set of processes. How did this affect the quality management of the project?

2. Respond to student post 200 words and 1 Referenc:

Hello Class and Professor-

So I have not worked too many projects without a set of processes, but at the same time, I have been able to show a little creativity in the projects I have worked on.

There are the basic ways of doing things- that are standard across the board, that is in line with the scope of the project. But I also have been able to think outside of the project's box, especially when things change, and have to come up with new ideas and thoughts. (plan B)

I think integrated sets of processes set limitations and constraints. I would imagine that someone who has a set of rules and guidelines with very little wiggle room would be almost robotic, leaving less room to be creative and to show other ideas. Sure- in some cases, a totally integrated set of processes might be a fool proof plan of doing business, but what if that plan fails?

Sticking to a basic plan doesn't prepare someone for those situations that happen when the old faithful way of doing things isn't working. I think it's very cookie- cutter in some cases, because some projects are unique, and what may work for some cases, may not work for all. But that is just my perspective on a plan that seems to be uniformed, with no room for changes.

3. Respond to student post 200 words and 1 Reference

Dr. Locker, Shannon,and class,

Based on the name change, it seems redundant to have to repeat the same process multiple times. This is time consuming and many times can be alleviated with a better system. On the other hand, Shannon brings up a good point regarding limitation and constraints. I have seen this in the workplace.

There are several procedures that are repetitive and sometimes old-fashioned in a sense that there is still much that is done on paper. Sometimes, it makes sense to improve processes and simplify to reduce and reduce unnecessary steps. Depleting waste within work systems seems obvious. But, what happens when the network goes down and the simplified system is no longer an asset to the process?

4. Respond to student post 200 words and 1 Reference

Just because we are doing tasks in preparation for something, does not necessarily mean that our processes are integrated. Let me see if I can explain using an example.

I could only have wished we would have had an integrated process with all of the various software applications and accesses when I went to change my name a few years ago due to marriage. Within my work environment, there was no such option.

So, instead of simply completing one form (which would be done for an integrated process), I had to submit a DD2875 form for each and every software application (outside of the standard desktop) for which I needed access. This proved to be very time consuming, and there was a lot of redundancy. From my perspective, an integrated process could have greatly simplified this on multiple levels.

Do you have a better understanding or shall I elaborate?

DS2 CHP12

5. What are the advantages and disadvantages for a project manager to use Project Management software over managing a project manually? What type of general purpose software might project managers find useful? Why?

6. I suspect that as we tackle the question about the different types of software available to us as project managers, we are going to unearth a LOT of features in some of the more common applications that many did not know even existed. For instance, did you realize the number of templates available in MS Excel? I think you'll be surprised at what you will find.

All: Did you realize the many benefits of Excel? In the future, how might you incorporate this application into your next project management venture?

DS3 CHP13

7. How should a Project Management approach ensure that company policies and regulatory compliance are addressed in a project? What are some key internal and external factors that affect the following: a road or bridge construction project, an IT project for a bank, and a patient care system project for a hospital?

8. Respond to student post 200 words and 1 Reference:

A project in any capacity should not deviate from predefined company policy and regulations. However, I suspect we've all witnessed instances where what is supposed to happen isn't necessarily the reality of what unfolds.

Have you considered the value of audits? Audits are yet another way in which we can monitor a project to ensure compliance with policies, regulations, etc. (Kerzner, 2010). "These audits can be conducted at the end of each life- cycle phase or at the end of the project" (Kerzner, 2010, p. 450).

In my experience, I have participated in functional configuration audits and physical configuration audits. Both had distinct purposes, but the end result was that the project manager was able to take corrective action for any deviations or otherwise unfavorable results noted. In your experiences, have you participated in anything like this? If so, were you able to see the benefits? How were any problems addressed?

A project in any capacity should not deviate from predefined company policy and regulations. However, I suspect we've all witnessed instances where what is supposed to happen isn't necessarily the reality of what unfolds.

Have you considered the value of audits? Audits are yet another way in which we can monitor a project to ensure compliance with policies, regulations, etc. (Kerzner, 2010). "These audits can be conducted at the end of each life- cycle phase or at the end of the project" (Kerzner, 2010, p. 450).

In my experience, I have participated in functional configuration audits and physical configuration audits. Both had distinct purposes, but the end result was that the project manager was able to take corrective action for any deviations or otherwise unfavorable results noted. In your experiences, have you participated in anything like this? If so, were you able to see the benefits? How were any problems addressed?

Reference no: EM131716311

Questions Cloud

Display the volume of the sphere in the output function : Your program will ask the user to enter the radius of the sphere and will display the volume of the sphere in the output function.
Develop a resource development plan : Develop a Resource Development Plan for accessing and utilization of three resources.
Program that calculates the volume of a cylinder : Write a program that calculates the volume of a cylinder. Your program should ask the user to enter the radius and the height of the cylinder.
Assuming this is a worker-paced process : How long does it take the process to produce 200 units starting with an empty system, assuming this is a worker-paced process?
How did this affect the quality management of the project : What advantage is gained when you have a totally integrated set of processes? Describe a project you have worked on with an integrated set of processes.
How are you going to be doing the payroll calculations : How are you going to be doing the payroll calculations? What kind of data is going to be stored in your database?
Talent the founders say is essential to the company strategy : Skookum ensure it is hiring the kind of superior talent the founders say is essential to the company's strategy.
Explain how the history of cyber effort and cyber war impact : Explain how the history of the cyber effort and cyber war impact our national security and national intelligence?
Discuss about the population trimmed mean : For the data in Exercise, the trimmed mean is X t = 42.17 with a Winsorized standard deviation of sw = 1.73. Test the hypothesis that the population trimmed.

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd