Reference no: EM132510510 , Length: word count:2000
Engineering Quality Management
Section A
Students are required to carry out capability study on one dimension of the parts provided using two control charts i.e., Shewart and CUSUM. There are 10 batches in total with 5 made on one day and the remaining 5 made on a different day. Each student must assess a different dimension on the parts and must record his/her own measurements. Students must submit an individual report detailing their experience along with the objectives of the assessment. The report should contain the following:
(i) Shewart and CUSUM control charts
(ii) Suitability and discussion of control chart findings
(iii) Assessment of process capability and its significance
(iv) Discussion of measuring system accuracy and its impact
Section B
Discuss how capability studies fit into quality management systems and quality assurance with due reference to quality theories and relevant standards. Discussion must include the significance of the purchase order and capability studies of the new and existing machines for the manufacture of a product of your choice. It is important to clearly define a product and explain the usage of capability studies to increase production.
Intended learning outcomes for the assessment
This summative assignment will provide students the opportunity to gain knowledge and experience on:
Recording measurements in a reliable manner. Constructing different control charts and analysing them. Carry out capability studies based on control chart findings.
Understanding the importance of a purchase order for the manufacture of a particular product.
Comprehend the significance of quality standards and theories to make sound decisions in real world scenarios
Attachment:- Engineering Quality Management.rar