Reference no: EM133680894
Assignment: Logistics and Operations
Task
I. This is an individual task.
II. The task focuses on areas studied to date, requiring you to show knowledge and application in the parts stated.
III. You should upload a single, correctly formatted document which may also include any relevant tables and diagrams
Questions
I. Describe carefully all the tasks of a Production Manager
II. How do these tasks fit with the rest of the Organization?
III. How can Production Management help to reduce costs?
IV. Explain what productivity means. Main factors impacting productivity.
Case Premium Paper
Company "Premium Paper" is located near Paris. The design and print paper for furniture applications (usually called melamine paper). Production process consists on printing raw paper. Raw paper is delivered in big rolls (700 Kgs). Production process is done in multi-stage printing machines. Each stage of the machine contains an engraved cylinder and ink. Paper runs on the different stages and the combination of all of them provides the final printed paper.
Set up times in these machines are very long (3/4 hours). This means that every time the process is stopped because of any technical issue, the costs can be enormous.
Premium paper has 6 printing lines (3 "Stoner" Machines , 2 "Rotomec" Machines and 1 "Grimaldi" Machine (the oldest one)
Premium Paper has a highly experienced maintenance team. Every time a machine suffers a breakdown they run and try to fix it as soon as possible. However due to some unexpected failures and lack of spare parts, "Premium Paper" is suffering very serious productivity problems.
I. How should you define the maintenance process?
II. Which changes should you implement in terms of maintenance?
III. Which recommendations should you address to the Top Management with respect the machines park?