Reference no: EM132711664
Unit 09 Principles of Heating Services Design & Installation - Higher National Certificate in Construction and the Built Environment
Heating System Design Briefs and Heating Load Analysis
Learning Outcome 1: Identify pre-design information required for a non-domestic heating system.
Learning Outcome 2: Analyse heating loads for non-domestic buildings.
Assignment Brief
Your role as a trainee building services design engineer is under review. As you are heading towards the completion of your company training scheme, your manager has decided that you have gained enough experience to complete a design for a building heating system. They have also decided that your depth of knowledge and understanding can be assessed, and additional supplementary design and comfort information should also be supplied as part of the process.
You have been provided with the drawings of a building and all the other necessary information about it. You have been asked to provide information and relevant design calculations regarding a proposed non-domestic heating system which would be suitable for the building provided, including any possible sustainable options and other information that you may require. Your work should make reference to industry standard guides and legislation.
• Further to the assignment brief, explain the design process stages for your proposal of a non-domestic heating system.
• Discuss the information that should be included in a design brief for a non-domestic heating system design.
• You must produce the design data for the heating system in your proposal using a recognised method and format to include the attached drawings and data below for guidance.
• Use your knowledge on the form and fabric of the building for your proposal to demonstrate how you will perform the necessary U-value calculations.
• Use the U-values, to calculate the heat loss for the spaces in the building.
Calculate the total heating load for a given building, using the drawing layouts
Attachment:- Principles of Heating Services Design.rar
Degree of operating leverage-steele insulators
: Steele Insulators is analyzing a new type of insulation for interior walls. The initial fixed asset requirement is $1.62 million
|
What is the profitability index
: Assume a project has cash flows of -$54,300, $20,000, $37,300, and $14,300 for Years 0 to 3, respectively. What is the profitability index given a required retu
|
Find what cost of goods manufactured for durian company
: Find What cost of goods manufactured for Durian Company? The manufacturing overhead amounts to 50% of the direct labor.
|
Should Scoot Ltd purchase the motors from the outside vendor
: On the basis of financial considerations alone, should Scoot Ltd purchase the motors from the outside vendor? Show your calculations
|
Heating system design briefs
: Heating System Design Briefs and Heating Load Analysis - Identify pre-design information required for a non-domestic heating system
|
Why is so for the treadway commission indicated that bonus
: Financial results have been a factor in financial frauds, particularly when the bonus is large component of an individual's compensation. Why is this so?
|
Amount of the operating cash flow-webster
: Webster's has sales of $730,000 and a profit margin of 6.8 percent. The annual depreciation expense is $82,600. What is the amount of the operating cash
|
Make the allowance for uncollectible and the accounts
: Make the Allowance for Uncollectible and the Accounts Receivable accounts based on the information presented and balance off each account.
|
What is the profitability index
: What is the profitability index given a required return of 12.6 percent?
|