1.How is project scope defined?

A)The length of your project and how much it will cost

B)The deliverables or outputs during the course of the project

C)The range of resources you have available and their capabilities

D)What you expect to deliver to your customer when the project is complete

E)The range of customer expectations

 

2.There are 5 steps involved when defining a project, which of the following is the first?

A)Establish project priorities

B)Define the project scope

C)Verify the budget available

D)Assign team members to work on the project

E)Determine the required completion date

 

3.Which of the following is NOT true regarding scope creep?

A)It is when the cost of the project is more than expected

B)It is the tendency for the project scope to expand over time

C)It most likely caused by a scope statement that is too broad

D)It can have both positive and negative impacts on a project

E)It can lead to added costs and possible project delays

 

4.In reviewing the project plan, Susan sees that the first prototype must be completed by October 12. This would be best classified as a

A)Project target

B)Limit item

C)Milestone

D)Project objective

E)Critical goal

 

5.There are 5 steps involved when defining a project, which of the following is the second?

A)Analyze the strategic plan

B)Analyze the current budget plan

C)Establish project priorities

D)Select team members

E)Define the major objectives to meet the customer's needs

 

6.One of the primary jobs of a project manager is to manage the trade-offs associated with the project. Which of the following is NOT one of the basic classifications of project priorities?

A)Profit

B)Cost

C)Time

D)Performance

E)All of these are basic classifications

 

7.Scott has just been given a project that has a specific completion date. After a discussion with top management he finds that while the date is important the cost is more important and a slip in delivery would be acceptable if required to meet the cost targets. The completion date is best classified as

A)Constrain

B)Enhance

C)Accept

D)Limit

E)Optional

 

8.The _________ is used to assist in making project trade-offs between schedule, budget, and performance objectives.

A)Responsibility matrix

B)Work breakdown structure

C)Project priority matrix

D)Work package

E)Criterion matrix

 

9.The highest element in the hierarchical breakdown of the WBS is

A)A work package

B)Sub deliverables

C)A cost account

D)Major deliverables

E)The project

 

10.All of the following are ways the WBS helps in managing projects EXCEPT

A)With cost and time estimates the WBS makes it possible to plan, schedule and budget the project

B)It provides management with information appropriate to each level

C)It can be used to define communication channels

D)It allows the project manager to establish the overall objective of the project

E)As it is developed, organizational units and individuals can be assigned responsibility of work packages.

 

11.There are 5 steps involved when defining a project, which of the following is the last?

A)Code the WBS for the information system

B)Assign the cost account to a manager

C)Assign the work package to a manager

D)Develop the responsibility matrix

E)All of these are included in the final step

 

12.The WBS is best suited for projects that have a tangible outcome. Which of the following is used when the final outcome of the project is less tangible or is a product of a series of steps or phases?

A)Responsibility matrix

B)Organization breakdown structure

C)A work breakdown structure is still effective for these types of projects

D)Priority matrix

E)Process breakdown structure

 

13.The tendency for the project deliverables to expand over time-usually by changing requirements, specifications, and priorities-is called:

A)Scope erosion

B)Scope creep

C)Project bloat

D)Scope enhancement

E)Project add-ons

 

14.Which of the follow is least likely to be included in a work package?

A)How long the work package should take to complete

B)A description of work to be performed

C)Overhead expenses

D)How much the work package should cost to complete

E)The person responsible for the work package

 

15.Having a strong communication plan can go a long way toward mitigating project problems. A communication plan should address all of the following EXCEPT

A)When the information will be communicated

B)How information should be communicated and to whom

C)What methods will be used to gather and store information

D)What information needs to be collected and are there limits as to who has access to it

E)All of these should be addressed in a communication plan.

Reference no: EM131382401

Questions Cloud

Develop the full allowable tensile load : Design the fillet welds parallel to the applied load to develop the full allowable tensile load of the 6-in.-by- 3 8 -in. ASTM A36 steel plate shown. The electrode is an E70.
Give the answer of muliple choice question : Bill is working on a project involving the upgrading of a management information system. The project is being managed by the information systems department with the coordination of other departments occurring through normal channels. He is working..
Design an end connection using longitudinal welds : Design an end connection using longitudinal welds and an end transverse weld to develop the full tensile capacity of the angle shown. Use A36 steel and E70 electrodes.
Create a formula with structured references : Create a formula with structured references to calculate the percentage of the list price. Format the field with Percent Style with one decimal place.
Give the answer of muliple choice question : How is project scope defined?There are 5 steps involved when defining a project, which of the following is the first?One of the primary jobs of a project manager is to manage the trade-offs associated with the project. Which of the following is NOT ..
Calculate number of days between listing date and sale date : In cell J2, enter a formula to calculate the number of days between the listing date and sale date. Use the Subtotal feature to calculate the average selling price, percentage of asking price, and days on market by city.
What percent of all ticket holders are no-shows : What's the probability that a customer who didn't show had an advance-purchase ticket?
What’s the probability that chuck is on the job : You go to Dan's for supper one night and hear a dish break at the sink. What's the probability that Chuck is on the job?
What is the probability that leah’s first flight was delayed : Are the first flight leaving on time and the luggage making the connection independent events? Explain.

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd