Reference no: EM132358810
Project and Program Information & Communication Systems Assignment -
Assessment - Portfolio
Assessment Details: The Portfolio is divided in to three parts:
Design Specification Report
Design Proposal Report
Perform Test Plan
Walkthrough
In the first part, produce a report detailing the system requirements specification for Information and Communication Technology (ICT) in a project (1000-1200 words). This is a group task where the members in the team can examine the literature to source relevant information for the analysis and integration of business processes. The purpose of this assignment is to produce a proposal for a CPO that outlines the main system requirements for an Information System (IS) solution in a project.
In the second part, generate a baseline report for a proposed IS system in a project. The report must contain a business continuity plan, suitable performance metrics and KPIs (1500-1800 words). The results from the above RSR are analysed and the students can now combine their effort to create the design for the proposed IS system. The design must include suitable workflows and swim lanes for business processes, performance metrics, and functional and non-functional decomposition of the system components such as availability, security, and infrastructure. Consideration for different options for the system architecture must be provided. For example, a cloud solution with service level agreement (SLA).
In the final part, create and execute a test plan for your proposed design (1500-1800 words). Students need to test the proposed design, carry out a performance test and a business continuity plan. The design may include a web-based project management tool, a Portal design for project, Service catalogue and SLA for cloud solutions. Data for simulation of performance using suitable metrics and if necessary, data conversion.
Part 1 -
- A brief literature review detailing the ICT requirements for a Project Management Information System and select an organisation to explore this further.
- Conduct a brief analysis of your chosen organisation's business processes.
- Based on your analysis, propose the design and development of a new web-based project management tool or a Portal for managing projects in your chosen organisation.
- Provide justification for your chosen tool.
- Word limit: 1000-1200 words (excluding references and appendix)
Part 2 -
Generate a Requirement specification Report (see RSR Template) for the proposed IS System which must include
- suitable workflows
- performance metric
- Functional and non-functional requirements of the system such as availability, security, infrastructure
- Must contain business continuity plan, suitable performance metrics and KPIs
- Discuss acquisition processes of the proposed IS System using some concepts such as SDLC etc.
Word limit: 1500-1800 words (excluding references and appendix).
Part 3 -
- Create and execute a test plan (see Test Plan Template) of the proposed system
- Recommendations on how to effectively utilise the proposed IS System and plans on business continuity etc.
- Word limit: 1500-1800 words (excluding references and appendix).
Attachment:- Information & Communication Systems Assignment File.rar
Design and develop a small Java console application
: ITECH7201 Software Engineering: Analysis and Design Assignment, Federation University, Australia. Design and develop a small Java console application
|
Practice of safeguarding information and managing risks
: Information Assurance is practice of safeguarding information and managing risks related to use, processing, storage and transmission of information
|
Why do we need to understand data visualisations
: Why do we need to understand data visualisations? There is more and more data around us, and data are increasingly used in decision-making, journalism,
|
Understanding of existing-emerging information technologies
: Demonstrate an understanding of existing and emerging information technologies, the functions of IS, and its impact on the organizational operations.
|
Generate a baseline report for a proposed IS system
: SBM1103 Project and Program Information & Communication Systems Assignment, Asia Pacific International College Australia. Generate baseline report for IS system
|
Discuss why organizations are moving to the cloud
: Define what an information silo is. Explain why information silos are a problem for organizations. Discuss why organizations are moving to the cloud.
|
Kinds of environments need different scheduling techniques
: Different kinds of environments need different scheduling techniques. A high-volume environment is typically done through line design and balancing.
|
One group powerpoint presentation from another group
: All students must review one Group PowerPoint Presentation from another group. First each student must summarize content of PowerPoint of another group.
|
Analysis of personal and organisational styles
: BUMGT6927 Creativity and Innovation Assignment, Federation University, Australia. Analysis of personal and organisational styles
|