Galvaset Industries manufactures and sells custom-made windows. Its job casting system was designed using an activity-based casting approach. Direct materials and direct labor costs are accumulated separately, along with information concerning three manufacturing overhead cost drivers (activities). Assume that the direct labor rate is $20 per hour and that there were no beginning inventories. The following information was available for 2010, based on an expected production level of 50,000 units for the year, which will require 200,000 direct labor hours:

            Activity                  Budgeted                      Cost Driver Used                                Cost

        (Cost Driver)             Cost for 2010              as Allocation Bas               Allocation Rate

Materials handling                  $  325,000                    Number of parts used             $ 0.25 per part

Cutting and lathe work            2,340,000                     Number of parts used               1.80 per part

Assembly and inspection         5,000,000                     Direct labor hours                  25.00 per hour

The following production, costs, and activities occurred during the month of March:

Units                           Direct                          Number                      Direct

Produced                Materials Costs            of Parts Used             Labor Hours

3,800                           $142,000                     83,600                        17,180  

 Required:

  1. Calculate the total manufacturing costs and the cost per unit of the windows produced during the month of March (using the activity-based costing approach).
  2. Assume instead that Galvaset Industries applied manufacturing overhead on a direct labor basis (rather than using the activity-based costing system previously described). Calculate the total manufacturing cost and the cost per unit of the windows produced during the month of March. (Hint: You will need to calculate the predetermined overhead application rate using the total budgeted overhead coasts for 2010.)
  3. Compare the per unit costs figures calculated in parts a and b. Which approach do you think provides better information for manufacturing managers? Explain your answer.

Reference no: EM13379757

Questions Cloud

The president of the united states has been elected on the : the president of the united states has been elected on the promise of fiscal responsibility. by law he cannot reduce
What exactly is stress what is the difference between : what exactly is stress? what is the difference between so-called good stress or so-called bad stress? when it comes to
In table 2 in p 175 hatchett and park 2004 presented the : in table 2 in p. 175 hatchett and park 2004 presented the correlations among optimism lot-r total and positive items
Keays et al 2003 conducted a correlational study to : keays et al. 2003 conducted a correlational study to determine the relationship between muscle strength and functional
Galvaset industries manufactures and sells custom-made : galvaset industries manufactures and sells custom-made windows. its job casting system was designed using an
Nbsplampart co makes specialty table lamps manufacturing : nbsplampart co. makes specialty table lamps. manufacturing overhead is applied to production on a direct labor hours
Hightech inc and oldtime co complete within the same : hightech inc. and oldtime co. complete within the same industry and had the following operating results in
Body sculpture inc makes three models of high-performance : body sculpture inc. makes three models of high-performance weight-training benches. current operating data are
Variable and absorption costing unit product costs and : variable and absorption costing unit product costs and income statements explanation of difference in net operating

Reviews

Write a Review

Cost Accounting Questions & Answers

  Accounting and partnership problems

Accounting and Partnership problems

  Define and discuss the federal/private audit gap

An agency's Performance and Accountability Report (PAR) is considered a primary source of planning information. Why is this? When are PARs due (in draft and in final)?

  For every event listed below select the appropriate

for every event listed below select the appropriate category which describes the effect of the event on a statement of

  Evaluate the income statement

Evaluate the income statement in the given case.

  Find what was young''s total share of net loss

Find what was Young's total share of net loss for the first year and evaluate what was Eaton's total share of net loss for the first year?

  In summer 2005 time warner inc announced they were setting

in summer 2005 time warner inc. announced they were setting aside 3 billion to settle lawsuits from shareholders who

  Qa company using activity based pricing marks up the direct

qa company using activity based pricing marks up the direct cost of goods by 30 plus charges customers for indirect

  Qswensons meats is taken whether it could replace a meat

qswensons meats is taken whether it could replace a meat grinder patty shaper machine. the new machine will produce 25

  Question1 trevor price bought 10-year bonds issued by

question1. trevor price bought 10-year bonds issued by harvest foods 5 years ago for 982.79. the bonds make semiannual

  Parent company statements parent company acquired 90

parent company statements parent company acquired 90 percent of son inc. on january 31 20x2 in exchange for cash. the

  What is pro forma reporting according to regulation sx

What is pro forma reporting according to regulation SX of the SEC? How has pro forma reporting been used by corporations over the years? Summarize the arguments for and against this type of reporting.

  Prepare the budgets for the quarter ending

Prepare the four budgets for the quarter ending 30 June 2013 only. (Show the total of the three months in these budgets only. Do not show the monthly figures. Round your numbers for these budgets up to zero decimal places):

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd