Reference no: EM13154690
The Durant Company is installing an absorption standard-cost system and a flexible-overhead budget. Standard costs have recently been developed for its only product and are as follows:
Direct materials 3 pounds @ $20 $60
Direct labor 2 hours @ $14 28
Variable overhead 2 hours @ $5 10
Fixed overhead ?
Standard cost per unit of finished product $ ?
Expected production activity is expressed as 7,500 standard direct-labor hours per month. Fixed overhead is expected to be $60,000 per month. The predetermined fixed-overhead rate for product costing is not changed from month to month.
1. Calculate the proper fixed-overhead rate per standard direct-labor hour and per unit.
2. Assume that 6,000 standard direct-labor hours are allowed for the output achieved during a given month. Actual variable overhead of $31,000 was incurred; actual fixed overhead amounted to $62,000. Calculate the
a. Fixed-overhead flexible-budget variance
b. Fixed-overhead production-volume variance
c. Variable-overhead flexible-budget variance
What percentage of students score between given range
: The SAT scores of students are normally distributed with a mean of 950 and a standard deviation of 200. What percentage of students score between 1100 and 1200?
|
A few random results
: A few random results for you to ponder...do the results justify the conclusions? Why or why not? Give a reason why the conclusions don't necessarily follow from the statement.
|
Explain mechanism of a certain reaction
: Analyzing a new reaction Consider the following elementary steps that make up the mechanism of a certain reaction: 1.3A>B+C 2. B+2D>C+F A. What is the overall reaction?
|
What accounts are permanent and temporary
: The company's Land account had a $5,000 balance. Dividends amounted to $300. There was $1,000 of common stock issued. What accounts are permanent and which ones are temporary?
|
Fundamentals of overhead variances
: Calculate the proper fixed-overhead rate per standard direct-labor hour and per unit. Assume that 6,000 standard direct-labor hours are allowed for the output achieved during a given month. Actual variable overhead of $31,000 was incurred; actual ..
|
Discuss use sources from the itt tech virtual library ad
: Review the discussion in the lesson regarding the financial crisis. Discuss each of the following points. Use sources from the ITT Tech Virtual Library to add to your answer.
|
Well-designed sample of at least 30 units
: Select a well-designed sample of at least 30 units. (Describe the population to be studied and the sampling frame). Two variables should be measured with a potential for correlation; if you measure more than two variables, you must correlate two at a..
|
What percentage of terminals will be replaced
: If the manufacturer guarantees the terminals for 3 years (and will replace them if they malfunction), what percentage of terminals will be replaced?
|
Evaluate the following statements concerning variance analys
: Evaluate the following statements concerning variance analysis.
|