Functions or operations

Assignment Help Engineering Mathematics
Reference no: EM13823280

The company from Week 1 has merged with another smaller company that operates out of Kobe, Japan. Each company has its own personnel database. In order to take advantage of Microsoft Excel's database features, these two databases must be merged.

Part 1: For the worksheet labeled "Seattle, Washington," perform the following steps:

  1. Save the spreadsheet using the following naming scheme: FirstInitialLastName_week2IPa (e.g., MRogers_week2IPa.xls).
  2. Add 2 columns to the next to the Full Name column. Label the first new column "First" and the second new column "Last." Using either spreadsheet functions (e.g., Left, Right, or Find) or text-to-columns, split the Full Name column into a First Name column and a Last Name column.
  3. Change the contents of the Full Name column to be in "Last Name, First Name" format.
  4. Add another column, and label it "Location." Place the worksheet name in each row of this column for each employee. Use either Copy and Paste or Fill Down operations.
  5. Change the Manager column contents to be in "Last Name, First Name" format. You may add temporary columns to do this and then delete them afterward. (If you use formulas that reference temporary columns, you cannot delete the temporary columns. Hint: Copy the calculated formula results, and paste values on top of them.)
  6. Adjust column widths for the best fit of all data.

Part 2: For the worksheet labeled "Kobe, Japan," perform the following steps:

  1. Add a column to the right of the Last column. Label it "Full Name."
  2. Using spreadsheet functions or operations, populate the Full Name column using the format "Last Name, First Name."
  3. Add another column, and label it "Location." Place the worksheet name in each row of this column for each employee. Use either Copy and Paste or Fill Down operations.
  4. Change the job titles to match Seattle job titles using the following information:

    Kobe Title

    Seattle Title

    Assistant

    Administrative Assistant

    Customer Service Level 1

    Customer Service Representative

    Customer Service Level 2

    Software Analyst

  5. Convert the Salary column contents from Japanese yen to U.S. dollars using the conversion rate 1 U.S. dollar = 84 Japanese Yen. You may add temporary columns to do this and delete them afterward.
  6. Add a column, and label it "Manager." Populate this new column. All employees report to the manager in Kobe. The manager in Kobe reports to the CEO in Seattle. Use the format "Last Name, First Name" for this column.

Reference no: EM13823280

Questions Cloud

Aggressive in collecting receivables to reduce carrying cost : Suppose the company decides it needs to be more aggressive in collecting receivables to reduce carrying costs. In order to accomplish this, it contracts with a vendor to provide follow-up services for a quarterly cost of $500 per account (customer).
Explain methods for artificial aggregate productions : Explain methods FOR artificial aggregate productions :1. Cold-bonding method (EXPLAIN detailed)2. Sintering Method (EXPLAIN detailed)
Relation between integrity and magnanimity : In his discussion of virtue and honor in the military, what does Robinson consider to be the relation between integrity and magnanimity
Explain fly ash and slag : Define Waste materials Generally then divided into two groups with their definitions (Hazardous and Non-Hazardous )waste materials, Then explain Fly ash and Slag(GGBFS) Considered as which type ??
Functions or operations : Add a column to the right of the Last column. Label it "Full Name." Using spreadsheet functions or operations, populate the Full Name column using the format "Last Name, First Name."
Discuss the impact upon and airline for violating dot rule : Discuss the impact upon and airline for violating DOT Rule, also include actions management should institute to prevent this from happening in their airline.
Develop a coherently structured paper with an introduction : Develop a coherently structured paper with an introduction, body, and conclusion. Provide a concluding paragraph that summarizes the stated problems and promises a solution.
Produces leather handbags : Albertville Inc. produces leather handbags. The production budget for the next four months is: July 5,000 units, August 7,000, September 7,500, October 8,000. Each handbag requires 0.5 square meters of leather. Albertville Inc.’s leather inventory po..
Rod readings are taken at the corners successively : A rectangular lot running N-S and E-W is 150 by 100 ft. To locate contours it is divided into 50-ft square blocks, and the following rod readings are taken at the corners successively along the E-W lines, proceeding from west to east, and beginning w..

Reviews

Write a Review

Engineering Mathematics Questions & Answers

  Prime number theorem

Dirichlet series

  Proof of bolzano-weierstrass to prove the intermediate value

Every convergent sequence contains either an increasing, or a decreasing subsequence.

  Antisymmetric relations

How many relations on A are both symmetric and antisymmetric?

  Distributed random variables

Daily Airlines fies from Amsterdam to London every day. The price of a ticket for this extremely popular flight route is $75. The aircraft has a passenger capacity of 150.

  Prepare a system of equations

How much money will Dave and Jane raise for charity

  Managing ashland multicomm services

This question is asking you to compare the likelihood of your getting 4 or more subscribers in a sample of 50 when the probability of a subscription has risen from 0.02 to 0.06.]  Talk about the comparison of probabilities in your explanation.

  Skew-symmetric matrices

Skew-symmetric matrices

  Type of taxes and rates in spokane wa

Describe the different type of taxes and their rates in Spokane WA.

  Stratified random sample

Suppose that in the four player game, the person who rolls the smallest number pays $5.00 to the person who rolls the largest number. Calculate each player's expected gain after one round.

  Find the probability density function

Find the probability density function.

  Develop a new linear programming for an aggregate production

Linear programming applied to Aggregate Production Planning of Flat Screen Monitor

  Discrete-time model for an economy

Discrete-time model for an economy

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd