Formulate the linear programming model for this problem

Assignment Help Mathematics
Reference no: EM131064730

QUESTION 1- Anderson Co. produces two popular grades of carpeting among its many other products. In the coming production period, Anderson needs to decide how many rolls of each type of carpet should be produced in order to maximize profit. Each roll of Type A carpet uses 40 units of synthetic fiber, requires 32 hours of production time, and needs 18 units of foam backing. Each roll of Type B carpet uses 35 units of synthetic fiber requires 20 hours of production time, and needs 25 units of foam backing.

The profit per type of Type A carpet is $300 and the profit per roll of type B carpet is $210. In the coming production period, Anderson has 4000 units of synthetic fiber available for use. Workers have been scheduled to provide at least 2200 hours of production time (overtime is a possibility). The company has 1800 units of foam backing available for use.

Formulate the linear programming model for this problem.

Let x = the number of rolls of Type A carpet to make

Let y = the number of rolls of Type B carpet to make

Note: In the last field of the constraints, you should include the sign and the RHS value without space between them (for example <=1000).

Question 2- The Mystic Outdoor Shop mixes two types of grass seed into a blend. Each type of grass has been rated (per pound) according its shade tolerance ability to stand up to traffic, and drought resistance, as shown in the table. Type A seed costs $1 and Type B seed costs $2. If the blend needs to score at, least 300 points for shade tolerance, 500 points for traffic resistance, and 680 points for drought resistance, how many pounds of each seed should be in the blend? How much will the blend cost?

 

Type A

Type B

Shade Tolerance

2

2

Traffic Resistance

1

3

Drought Resistance

3

4

Let A = the pound of Type A seed in the blend

Let B = the pound of Type B seed in the blend.

Note: for the constraints, in the last field you need to include the sign of the constraint and the RHS (for example: <=600).

QUESTION 3-

Solve the following linear program graphically.

Max       8X + 7Y

s.t.        15X + 5Y ≤ 75

             10X + 6Y ≤ 60

                 X+ Y ≤ 8

                  X, Y ≥ 0

QUESTION 4- Attach your graph for the previous problem. Only one file can be attached.

QUESTION 5- Use this graph to answer the questions.

750_Figure.png

Which area (I, II, III, IV, or V) forms the feasible region?

Which point (A, B, C, D, or E) is optimal?

This problem is maximization. Constraints with negative slope are pointing towards the origin, and the constraint with positive slope is pointing up.

QUESTION 6- Does the following linear programming problem exhibit infeasibility, unboundedness, or alternate optimal solutions?

Min      1X+ 1Y

s.t.      5X + 3Y ≤ 30

           3X + 4Y ≥ 36

                Y ≤ 7

              X, Y ≥ 0

The problem is "infeasible", "unbounded" or has "multiple solutions".

Reference no: EM131064730

Questions Cloud

Fully depreciated by the straight line method : Raphael Restaurant is considering the purchase of a $9,400 souffle maker. The maker has an economic life of 5 years and will be fully depreciated by the straight line method. The machine will produce 1,700 souffles per year, with each costing $2.50 t..
Assume debt proceeds are used to repurchase equity : Neal Enterprises has no debt. Its current total value is $76.8 million. Assume debt proceeds are used to repurchase equity. Ignoring taxes, what will the company’s value be if it sells $35.4 million in debt? Suppose now that the company’s tax rate is..
Subject to integrity verification using the safe assignment : - Each group is required to choose a project from the list below - The weight of this project in your overall grade is 10%.
Relevant cash flow scenario-funds for net working capital : Relevant Cash flow scenario Assume you have just graduated from college with a degree in finance and you are trying to explain to your boss the importance of identifying and using the appropriate cash flows when you make financial decisions. The comp..
Formulate the linear programming model for this problem : Anderson Co. produces two popular grades of carpeting among its many other products. Formulate the linear programming model for this problem
Supplies and equipment for your operations : Your company is deciding to expand to the following countries, and you and two other managers will have to visit these countries to set up operations. You have $1,500.00 to convert in each currency. Utilizing the same exchange rate, while you are vis..
What is the effective cost of the commercial paper : On February 3, 2010, the Burlington Western Company plans a commercial paper issue of $20 million. The firm has never used commercial paper before but has been assured by the firm placing the issue that it will have no difficulty raising the funds. W..
Thinking of building a chemical processing plant : GDebi Enterprises is thinking of building a chemical processing plant to produce 4-hydroxy-3-methoxybenzaldehyde. The firm estimates that the initial cost of the project will be $13.2 million, and the plant will produce cash inflows of $6 million for..
What is the expected value of this stock ten years : SRS, Inc. just paid an annual dividend of $1.78 last month. The required return is 12 percent and the dividend growth rate is expected to be constant at 2.3 percent. What is the expected value of this stock ten years from now?

Reviews

Write a Review

Mathematics Questions & Answers

  Questions on ferris wheel

Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.

  Logistic map

This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.

  Finding the probability of cards

This assignment has questions related to probabiltiy.

  Systems of ode

Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.

  Derive the boolean expression

Derive the Boolean Expression and construct the switching circuit for the truth table stated

  System of equations

Evaluate which equations are under-identified, just-identified, and over-identified.

  Linear programming problem

Linear programming problem consisting of only two constraints with one objective function.

  Find the natural domain

Find the natural domain of the given functions.

  Introduction to numerical methods

Compute the coecients of the polynomials using the term recurrence relation.

  Chart of the topological manifold

De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.

  Mathematics in computing

Questions related on mathematics in computing.

  Complex problems

Complex problems

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd