Reference no: EM13219281
The cost of making two products is $3 each. The first product requires 2kg and the second 4kg of material. You have at least a total of 16kg available. The time to produce the first product is 4 hrs and the second 3 hours. In total there are 24 hours available. You have an order for 2 items of the first product so must make sure you produce at least this amount.
Formulate as a linear programming problem.
Draw a graph for the problem and clearly identify the feasible solution space. Then calculate, by hand, showing all workings, the following:
(i) Optimum solution in full
(ii) Ranges for the Objective Co-efficients
(iii) Shadow Prices
(iv) Right Hand Side Ranges
Note
I have established the Min objective funtion:
Min Z = 3Y1 + 3Y2
Subject to:
2Y1 + 4Y2 => 16 (CONSTRAINT 1)
4Y1 + 3Y2 <= 24 (CONSTRAINT 2)
Y1 => 2 (CONSTRAINT 3)
Y2 => 0
And have graphed to find the solution as (printed below) be having issues with parts (ii), (ii) and (iv) of the questions:
What is the impedance of a resistor r in parallel
: What is the impedance of a resistor R in parallel with a series combination of a capacitor C and an inductor L? Assume angular frequency omega(w).
|
Describe how is dollar price of euros determined
: Cite a factor that might increase the dollar price of euros. Cite a different factor that might decrease the dollar price of euros. Explain: "A rise in the dollar price of euros necessarily means a fall in the euro price of dollars." Illustrate an..
|
Determine the thermal equilibrium recombination
: A semiconductor, in thermal equilibrium, has a hole concentration of p0 = 2x1016 cm-3. The minority carrier life time = 3x10-7 s. (Assume, ni = 1010 cm-3)
|
Contemporary problem
: Contemporary Problem Where You See The Status Quo As Lined Up Against Something That Is Just Or In Favor Of Something That Is Unjust Essays and Term Papers
|
Formulate as a linear programming problem
: Draw a graph for the problem and clearly identify the feasible solution space. Then calculate, by hand, showing all workings - Formulate as a linear programming problem.
|
Identify the types of system-building methods
: Identify the types of system-building methods used by Dorfman to build its wireless warehouse system.
|
What is the data transmission rate
: Suppose that data are stored on a 1.4-Mbyte floppy diskettes that weight 30 g each. Suppose that an airliner carries 10,000 kg of those floppies at a speed of 1000 km/h over a distance of 5000 km. What is the data transmission rate in bits per sec..
|
Will firm 2 expect higher or lower profit compared to profit
: Suppose that the two firms compete in output and set their output levels simultaneously. Given that firm 1's reaction curve is Q1 = 150 - 2Q2 and firm 2's reaction curve is Q2 = 150 - 2Q1, what are the two firms' output levels in equilibrium
|
Draw a band diagram
: Calculate the Fermi level position relative to conduction band (Ec-Ef) and relative to valence band (Ef-Ev).
|