Formulate and solve this lp production mix situation

Assignment Help Engineering Mathematics
Reference no: EM131313888

Linear, Integer and Mixed Integer Programming

Scenario 1: The All Season Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 6.7 hours of wiring and 6.85 hours of drilling. Each fan must go through 4.95 hours of wiring and 5.65 hours of drilling. During the next production period, 310 hours of wiring time are available and up to 335 hours of drilling time may be used. Each air conditioner sold yields a profit of $75.70. Each fan assembled may be sold for a $55.95 profit.

Question 1: Formulate and solve this LP production mix situation to find the best combination of air conditioners and fans and that yields the highest profit. Feel free to use the Excel template provided or the corner point method.

Question 2: Round your Solution Values to a whole number and calculate the profit using the rounded solution.

Scenario 2: All Season's management realizes that it forgot two critical constraints (see Question #1 above). In particular, management decides that there should be a minimum number of air conditioners and fans produced in order to fulfill a contract to a good customer.

Question 3: If All Season decides that at least 32 air conditioners and 15 fans should be produced, what would be the optimal solution? Use the Excel template provided or the corner point method.

Question 4: Round your Solution Values to a whole number and calculate the profit using the rounded solution.

Scenario 3: The ABC Corporation manufactures three electrical products; humidifiers, fans and air cleaners. The manufacturing process is composed of three processes: wiring, packaging and assembly. During the next production period, 2250 hours of wiring time are available, 70 hours of packing and up to 1590 hours of assembly time may be used. The following table presents the production requirements per unit:

Bill of Labor

Product

Wiring

Assembly

Packaging

Humidifiers

2.5 hrs.

3.25 hrs.

1.45 hrs.

Air Cleaners

1.75 hrs.

4.5 hrs.

1.0 hrs.

Fans

1.75 hrs.

2.9 hrs.

1.75 hrs.

Standard Costs

Product

Material

Labor

Overhead

Selling Price

Humidifiers

$23.50

$9.50

$28.50

$90.35

Air Cleaners

$28.15

$8.35

$19.75

$75.25

Fans

$8.55

$7.25

$11.25

$41.80

Question 5: Formulate and solve this LP production mix situation to find the best combination of air conditioners, humidifiers and fans and that yields the highest profit. Feel free to use the Excel template provided or the corner point method.

Question 6: Round your Solution Values to a whole number and calculate the profit using the rounded solution.

Scenario 4: Management did not like the solution presented in Scenario 3 above and, based on its open order file, placed additional constraints on the model. First there was an open order for at least 20 humidifiers, and 15 air cleaners, which have to be made, additionally after checking the inventory decided that 10 additional fans should be made.

Question 7: Formulate and solve this LP production mix situation to find the best combination of air conditioners, humidifiers and fans and that yields the highest profit. Feel free to use the Excel template provided or the corner point method.

Question 8: Round your Solution Values to a whole number and calculate the profit using the rounded solution.

Scenario 5: Using the data and constraints presented in Scenarios 3 & 4 and the fact that have hired two additional people to work in the Packaging Department which adds 80 hours to the time available and the constraint that no more than 25 humidifiers could be produced:

Question 9: Formulate and solve this LP production mix situation to find the best combination of air conditioners, humidifiers and fans and that yields the greatest profit. Feel free to use the Excel template provided or the corner point method.

Question 10: Round your Solution Values to a whole number and calculate the cost using the rounded solution.

Scenario 6: The ABC Corporation management has hired a cost accountant to make some recommendations regarding the cost allocation of labor used to produce air cleaners. The average wages of personnel performing particular processes are presented in the table below.

Assembly

Wiring

Packaging

Material Handling

$13.25

$15.10

$9.75

$13.10

Additional investigation into manufacturing costs reveal that at least 20% of the man-hours must be allocated to performing material handling tasks, 50% must be allocated to wiring and assembly and 30% must be allocated to wiring and packaging. If a block of 55 man-hours is analyzed answer the following questions:

Question 11: Formulate and develop a LP model to find the best combination of labor hours and that yields the lowest cost. Feel free to use the Excel template provided or the corner point method.

Question 12: The prior analysis revealed a flaw in the data; the accountants ignored the constraint that a minimum of fifteen man-hours had to be allocated to Wiring. Formulate and develop a LP model accounting for this new constraint.

Question 13: The prior analysis revealed another flaw in the analysis; the accountants failed to identify that packaging is over allocated thus they want to add another constraint stating that packaging must be allocated a maximum of twelve man-hours. Formulate and develop a LP model accounting for this new constraint.

Reference no: EM131313888

Questions Cloud

Define the basic premises of hr management : Define the basic premises of both HR management and HR development so that you can explain both terms to someone who is totally unfamiliar with either term
Analysis of the companys financial report aaiofi : Explanation of the AAIOFI mandates, which is applied for selecting Shariah-compliant stocks for Islamic fund investment and Analysis of the company's financial Report AAIOFI Shariah Mandate.
Demonstrates the comple-mentation property for des : This program should take as input a key K and a plaintext P and demonstrate that the DES complementation property holds for this key and plaintext. You may use an existing cryptography library for this exercise.
What were the causes of that accident or hazard : Discuss in detail any one industrial hazard/ accident taken place in that industry from reliable internet sources. What were the causes/reasons of that accident/hazard
Formulate and solve this lp production mix situation : Formulate and solve this LP production mix situation to find the best combination of air conditioners and fans and that yields the highest profit. Feel free to use the Excel template provided or the corner point method.
Why is project management so important in any field : Why is project management so important in any field? How can project management be applied to implement supply chain strategies?
Where is the lock cell feature : Where is the Lock Cell feature? Walk us through the steps to lock a cell? How do you know when the Lock Cell icon is active or not?
What are the steps to add the developer tab : What are the steps to add the Developer tab? Where can you go for help on recording a macro and adding a macro button?
Calculate the surface area : Implement a class IceCreamCone with methods getSurfaceArea() and getVolume(). In the constructor, supply the height and radius of the cone. Be careful when looking up the formula for the surface area-you should only include the outside area along ..

Reviews

Write a Review

Engineering Mathematics Questions & Answers

  The zero vector is an interior point of e

Eherorem 18.13 (steinhaus) if E is a Leansgue measurable subset of IRN suc that λ(E)>0,then the zero vector ia an interior point of E - E.

  Explaining the sensitivity information

Develop and solve a linear optimization model to determine the optimal mix to maximize profit and write a short memo to the president Kathy Chung explaining the sensitivity information in language that she can understand.

  Comprehensive financial analysis and proposal

Throughout this course, you will prepare a comprehensive financial analysis and proposal (excluding tables, figures, and addenda) that will demonstrate your understanding of key financial concepts, strategies, and practices.

  What is the probability of getting of given question

What is the probability of getting - Less than 3 on a single roll of a fair die and Hearts or clubs on a single pick from a well-shu?ed standard deck of cards?

  Solve problem graphically or by using the simplex iterations

Which syrup type do you recommend to be increased? Why - Suppose that the daily amount of syrup 1 is increased to 280 gallons. How much will this change contribute to the optimal profit?

  System optimal scenario

Show that the average travel time per person is minimized if 2,000 people travel by road. This is known as the "system optimal" scenario. What percent worse than system optimal is the user-optimal scenario?

  Responsible for controlling the weight of a box of cereal

As a quality analyst you are also responsible for controlling the weight of a box of cereal. The Operations Manager asks you to identify the ways in which statistical quality control methods can be applied to the weights of the boxes.

  What is the chance of meeting the schedule

What is the probability that the project will still finish at the originally scheduled completion date and what are the probabilities (in percent).of completing the project in 55 days, 60 days, and 65 days?

  Participant-variable design and demonstrated

Study 1 utilized a participant-variable design and demonstrated that women perform more poorly, on average, than men perform on the mathematics section of the Scholastic Aptitude Test (SAT).

  Find the test statistic

Provided below are summary statistics for independent simple random samples from two populations. Use the nonpooled t-test and the nonpooled t-interval procedure to conduct the required hypothesis test and obtain the specified confidence interval.

  What is the maximum number of applications per hour

Henry found that each step was assigned to a different person.  Each application is a separate process in the sequence shown above and when a worker is through with his work for one person, he starts the next person in line. What is the maximum nu..

  Discussion of the controls on the climate

Analysis of the climograph, identifying the climate zone by name and Koppen-Geiger classification and a discussion of the controls on the climate that produce this pattern.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd