For finding the elevation of point C the Azimuth Angle from poit A to C is measured as 76deg ?15'00". The height of the instrument during this measurement was 1.60m From the same setup from point A, the zenith angle and slope distance toward point B are measured as 83deg 32'30" and 186.23m respectively, while the elevation of point B is 315.34m AMSL. The Height of the target at B was set at 2.00m the horizontal angles BAC and CBA are measured as 60deg 37'54" and 81deg 59'06"
Determine:
a)the horizontal distance AB and elevation of point A
b)the horizontal distance AC
c)and Elevation of point C
At Point A in a pipeline carrying water (? = 62.4 lb/ft3) the diameter is 3.0 ft, the pressure is 11 psi, and the velocity 4 ft/s. At Point B, 6 ft higher than Point A, the diameter is 2.5 ft and the pressure is 4 psi
A 10-year, 12%, $1,000 bond that pays dividends quarterly can be purchased for $900. If the bond is purchased and pays as scheduled, calculate the nominal and the effective rate of return that the purchaser receives.
How will calculate the surface area of a rectangular open trench Length=100 mtr,Width=.6mtr,Depth= .75mtr.
ASM International, an Australian steel company, claims that a savings of 40% of the cost of stainless steel threaded bar can be achieved by replacing machined threads with precision weld depositions
a cm reactor receives influent containing 10.0 mgl of tracer for 2 h. then tracer addition is terminated but the flow
A BOD5 test sample of river water has the following test data. DO on day 0 = 7.9 mg/L. DO on day 5 = 2.3 mg/L. What is the BOD5 of the river water
An activated sludge process receives 4000m^3 / day containing 120 mg BOD /L from the primary settling tank and 3500 m^3/day Containing 25mg BOD/L from the secondary settling tank.
Draw A flow net. Show flow lines, flow Channels, and Equipotential lines. Using flow nets, please provide an estimate of seepage rate below the dam. Your submittal will provide the basis for an environmental impact statement regarding the construc..
A sample of aggregates weighs 400 grams. After drying at 112oF, its weight was 398.5 grams and absorption is 10%. Determine the moisture content and the free moisture.
Water at 20 degrees flows at a velocity of (V =) 2 m/s in a (D =) 250-mm diameter horizontal ductile iron pipe. Estimate the friction factor f in the pipe, and state whether the pipe is hydraulically smooth or rough.
A new development is to be constructed in Mexico City. Due to the large subsidence, the elevation at the proposed site must be raised prior to construction. The total volume of soil needed to raise the site is 100,000 cubic yards.
Calculate the precentage of carbon hydrogen and oxygen in ethanoic acid.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd