Five star hotel elv project

Assignment Help Project Management
Reference no: EM132332903

Five Star Hotel ELV (Extra Low Voltage) Project

Five Star Hotel ELV (Extra Low Voltage) Project Located in Bahrain, the Five Star Hotel ELV project was completed in 2011. The purpose of this project was to install, test, and commission the IT, communication infrastructure, and services for the hotel. The ELV project was part of a total program to deliver 11 sub-systems, including installation of data, voice, music, wireless, and CCTV systems. The project stakeholders included the hotel owner; the consultant they had employed on their behalf; and various civil, electrical, and construction teams involved in implementing the ELV project. This case study focuses on the Audio Visual (AV) sub-system, primarily installation of projectors and screens in the meeting rooms and conference facilities. Renosh Thomas, as the vendor's project manager, was responsible for issuing the client with complete drawings detailing the projects electrical requirements. Renosh knew these drawings needed to be accurate as these would be handed over to the civil and construction teams for use when building the sites. Bearing this dependency in mind, Renosh ensured his team completed accurate and timely drawings with the expectations that the civil and construction teams would complete the build and handover a completed room with all the electrical requirements as planned. The final phases of the ELV project required Renosh's team to visit the sites, install, and test the electrical equipment. At initiation and during the project's planning phases, the AV requirements were issued and communicated via drawings between the consultant, appointed by the customer, and Renosh's electrical team. The product specifications were based on lessons learned and templates from a similar project implemented in Dubai. The project scope was determined via the bill of quantities, materials, and tender documents. Renosh received only electrical drawings for the sites and continued to plan the installation requirements based on these drawings, going by the assumption that they were correct, accurate, and most recent. Throughout planning, the electrical team was not privy to any of the civil or construction drawings from the other teams, and hence remained completely unaware of structural changes being made on the original plans that they were still working on too.

During installation of the AV system, the team encountered a major problem- the projection was faulty. The projectors and screens were not aligning, causing the projected images to be cut off and unclear. Upon investigation it became apparent that certain structural changes had been added, making Renosh's drawings and calculations inaccurate. The customer's response to this communication oversight was to respond by sending Renosh a full collection of civil and construction drawings including all the latest revisions. Renosh spent considerable time reviewing the drawings to identify the relevant adjustments. This resulted in delays, rework, and wasted time as he ploughed through the drawings, many of which were excessive to his requirements. The problem the installation team encountered was that the ceilings had been elevated higher than the original design and this had been approved by the customer, who failed to communicate the new changes and approvals to Renosh's electrical team. The solution required changing the location of the projector by a meter and the screens had to be moved forward by centimeters. Renosh revised and issued new electrical drawings to the customer that went through the approval process again. The site had been handed over from civil and construction completed with decoration. However, this vital communication error resulted in the solution requiring reworking of parts of the site, such as opening the ceilings to access the electrical panels and make the new changes. This impacted the schedule by 8- 10 days, and reworked costs of opening, adjusting, and redecorating the site.

Questions

1. How did the project's scope of changes impact the project stakeholders?

2. What planning, monitoring, and control actions could the project manager take to avoid the situation?

3. How would you redesign the communications management processes to minimize the problems experienced by project managers?

Reference no: EM132332903

Questions Cloud

Purpose of reducing program risk : Identify four improvements that could be made for the purpose of reducing program risk.
Performing analysis of the risk management program : Specify four issues that may be identified when performing analysis of the risk management program.
Explain the value of the social learning approach to health : Psychological Perspectives for Health and Social Care- BN018467 – Specification – Edexcel Level 3 BTEC Nationals in Health and Social Care-NQF Level 3.
Car is clean and sparkling from top to bottom : Your goal is to ensure that the robot is able to do everything necessary to wash the car (outside only) so that the car is clean and sparkling from top
Five star hotel elv project : Five Star Hotel ELV (Extra Low Voltage) Project Located in Bahrain, the Five Star Hotel ELV project was completed in 2011. The purpose of this project
Describe different concepts of health : Sociological Perspectives for Health and Social Care- BN018467 – Specification – Edexcel Level 3 BTEC Nationals in Health and Social Care-NQF Level 3.
Rescue of chilean miners : On October 13, 2010, Foreman Luiz Urzua stepped out of the rescue capsule to thunderous applause and cries of "Viva, Chile!"; he was the last of 33 miners
Project task estimation and the culture of gotcha : How does the organization's culture support this sort of behavior? What pressures does the manager face? What pressures does the subordinate face?
Analyze the impact of professional development : What are some ways to analyze the impact of professional development, peer support, and mentoring of and by women and minorities

Reviews

Write a Review

Project Management Questions & Answers

  Describe some examples of internal and external stakeholders

Describe some examples of internal and external stakeholders that would be consulted in order to ascertain their communication needs.

  Components of a use case diagram

Define UML and describe how it fits in the OOAD methodology. Explain how a Use Case is developed and when it is utilized while explaining all components of a Use Case Diagram.

  Write a letter of application based on stated requirements

Write a letter of application based on the stated requirements of the advertised job and present evidence of your ability to meet those requirements. Initially you can work independently of the rest of your group, but before your final submission..

  Is synergy a valid rationale for mergers

Define synergy. Is synergy a valid rationale for mergers?- Describe several situations that might produce synergistic gains within the health services industry.

  Choose a project from your organisation where you do not

choose a project from your organisation. where you do not have a current project either use a project you have worked

  Describe the components of a situation analysis

Describe the components of a situation analysis. In the situation (or SWOT) analysis, the firm should identify its internal strengths (S) and weaknesses (W) and also examine external opportunities (O) and threats (T).

  Discuss project management in today organizations

Discuss project management in today's organizations. synthesize trends and issues as well as general perspectives of project management.

  Identify the critical path and compute project duration

MGT 550 - Project Management - Identify the critical path and compute project duration - Compute Latest Start, Earliest Start, and Float

  What can you do to encourage the disgruntled employee

The employee is not performing his duties properly, and productivity in his area has slowed. What can you do to encourage the disgruntled employee?

  Initiating periodic upgrades based on current trends

The sales manager is always focusing on how to improve customer service. Initiate periodic upgrades based on current trends.

  Analyze lessons learned from quality control

the project manager you decided to arrange a team meeting to identify and analyze lessons learned from quality control with stake holders what should you do

  How do chaos and complexity differ from one another

How do chaos and complexity differ from one another? Propose three concepts from the book that might be used to solve the issue.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd