1. Computer upgrades have a nominal time of 80 minutes. Samples of 10 observations each have been taken, and the results are as listed. Historical data show that the standard deviation of the upgrade times is 0.5 minutes.
|
|
Sample 1
|
Sample 2
|
Sample 3
|
Sample 4
|
Sample 5
|
|
Observation 1
|
79.2
|
80.5
|
79.6
|
78.9
|
79.7
|
|
Observation 2
|
78.8
|
78.7
|
79.6
|
79.4
|
80.6
|
|
Observation 3
|
80.0
|
81.0
|
80.4
|
79.7
|
80.5
|
|
Observation 4
|
78.4
|
80.4
|
80.3
|
79.4
|
80.0
|
|
Observation 5
|
81.0
|
80.1
|
80.8
|
80.6
|
81.1
|
|
Observation 6
|
77.8
|
78.8
|
80.4
|
77.7
|
79.8
|
|
Observation 7
|
79.3
|
79.6
|
79.4
|
80.6
|
81.0
|
|
Observation 8
|
80.4
|
80.5
|
78.7
|
80.8
|
80.6
|
|
Observation 9
|
81.1
|
79.4
|
81.3
|
81.0
|
80.8
|
|
Observation 10
|
80.9
|
80.2
|
80.5
|
79.2
|
77.9
|
|
Sample Mean, X-bar
|
79.69
|
79.92
|
80.1
|
79.73
|
80.20
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
What are the 3-sigma (z= 3) control limits to be used in the mean (X-bar) control chart and what is the decision based on this X-bar chart?
A)
B)
C)
D)
Computer upgrades have a nominal time of 80 minutes. Samples of 10 observations each have been taken, and the results are as listed. Historical data show that the standard deviation of the upgrade times is 0.5 minutes.
|
|
Sample 1
|
Sample 2
|
Sample 3
|
Sample 4
|
Sample 5
|
|
Observation 1
|
79.2
|
80.5
|
79.6
|
78.9
|
79.7
|
|
Observation 2
|
78.8
|
78.7
|
79.6
|
79.4
|
80.6
|
|
Observation 3
|
80.0
|
81.0
|
80.4
|
79.7
|
80.5
|
|
Observation 4
|
78.4
|
80.4
|
80.3
|
79.4
|
80.0
|
|
Observation 5
|
81.0
|
80.1
|
80.8
|
80.6
|
81.1
|
|
Observation 6
|
77.8
|
78.8
|
80.4
|
77.7
|
79.8
|
|
Observation 7
|
79.3
|
79.6
|
79.4
|
80.6
|
81.0
|
|
Observation 8
|
80.4
|
80.5
|
78.7
|
80.8
|
80.6
|
|
Observation 9
|
81.1
|
79.4
|
81.3
|
81.0
|
80.8
|
|
Observation 10
|
80.9
|
80.2
|
80.5
|
79.2
|
77.9
|
|
Sample Range
|
3.3 |
2.3 |
2.6 |
3.4 |
3.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
What are the control limits to be used in the Range (R) control chart and what is the decision based on this R chart?
Fixing a quality problem will often cost money; to minimize these costs it is best to find and fix the problem _______.
Which one of the following statements is incorrect about quality control activities, inspection and control charts?A)
B)
C)
D)
E)
Estimating the process capability index
: The Good Chocolate Company makes a variety of chocolate candies, including a 12-ounce chocolate bar (340 grams). The output of the machine that fills the bar molds is approximately normal with a mean of 340 grams and a standard deviation of 1.5 grams..
|
How much energy does it store
: A parallel-plate capacitor has 3.95 cm2 plates that are separated by 4.29 mm with air between them. If a 11.2 V battery is connected to this capacitor, how much energy does it store? The value of the permittivity of a vacuum is 8.8542 × 10 ^?12 C^..
|
Implications of increased concentration in the uk banking
: What are the main drivers of uk banks' profitability? what are the implications of increased concentration in the uk banking market? what were the main recommendations of the cruickshank report and how did the industry respond?
|
Find the mass of flesh that can be heated
: Steam can cause more serious burns than water at the same temperature. Here we examine this effect quantitatively, noting that flesh becomes badly damaged when its temperature reaches 50.0 C a)Calculate the heat released as 13.0g of liquid water a..
|
Finding the control limits used in the range control chart
: Computer upgrades have a nominal time of 80 minutes. Samples of 10 observations each have been taken, and the results are as listed. Historical data show that the standard deviation of the upgrade times is 0.5 minutes.
|
Choose a journal article-credible on-line source to critique
: Choose a journal article, book chapter, in-depth newspaper article, or credible on-line source to sum-up and critique.
|
What is the amount of ice remaining
: A large punch bowl holds 3.00kg of lemonade (which is essentially water) at 25.0C. A 5.80×10^?2kg- ice cube at -10.0C is placed in the lemonade a)What is the final temperature of the system? Ignore any heat exchange with the bowl or the surroundin..
|
Model of probability
: What is the 'Equally-likely Outcomes Model of Probability?" What is the formula for this model of probability?
|
What voltage is developed across the secondary coil
: a transformer has N^1 =350 turns and N^2 =2000 turns. If the input voltage is 170V, what voltage is developed across the secondary coil?
|