A rectangular unfinished concrete channel with wood forms is laid on a bottom slope of 0.0064 to carry a flow of 20m^3/s of water. Determine the width of the channel when the flow is in critical condition.
An intersection approach volume is 1,500 veh/h and includes 12% left turns with a through-vehicle equivalent of 2.3 tvu's/left turn. What is the total equivalent through volume on the approach
A lagoon with a volume of 1200 m^3 has been receiving a steady flow of a conservative waste at a rate of 100m^3/day for a long enough time to assume that steady-state conditions apply. The waste entering the lagoon has a concentration of 10mg/L.
calculate the density of a mixture of 90% air and 10% SO2 at a temperature of 150 degrees C and pressure of 1.10 atm.
Determine the operating speeds of the machine at which the machine's steady-state amplitude is less than 0.2 mm. Take keq = 3 EI/L3.
A rubber ball is inflated to a pressure of 65 kPa .At that pressure the diameter of the ball is 240mm and the wall thickness is 1.25 mm.The rubber has a modulus of elasticity E of 3.6 Mpa and a poisoon'd ratio of 0.48.
A freeway exit ramp has a single lane and consists entirely of a horizontal curve with a central angle of 90 degrees and a length of 628 ft. If the distance cleared from the centerline for sight distance is 19.4 ft
A major relining of the combustion vessel will occur during the fifth year at a cost of $30,000. If the interest rate is 15% per year, what is the lump-sum equivalent cost of this project at the present time
If a tractor with 23-hp, a max speed of 3.6 mph in 1st gear and an effieiciency of 92% is operated operated down a 4% slope and the rolling resistance is 80 lb/ton, what is the maximum external pull in each of the 4 gears.
The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.
The flow rate of water flowing in a 3m wide channel is to be measured with a sharp-crested triangular weir 0.5m above the channel bottom with a notch angle of 60°. If the flow depth upstream from the weir is 1.5m
The total dissolved inorganic carbon (TIC) of a sample of groundwater is 8.33 mM. The temperature of the aquifer is 15C, the pH is 7.5, and the ionic strength is 0.05 M. What is the H2CO3, HCO3-, CO3 2-, and the partial pressure of CO2? [Use activ..
The temperature was 200C, and the void ratio (e) of the soil was 0.43. Calculate the "Coefficient of Permeability" in "centimeters per second" (Given, k = (QL)÷(A Δh t)).
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd