Find the work done in the process and the final pressure

Assignment Help Civil Engineering
Reference no: EM13323690

Assume 0.1 kg of air initially at 200 kPa and 300 K undergoes an isothermal compression process to a volume of 0.02 m3. Find the work done in the process and the final pressure. Sketch the process on a P-V diagram.

Reference no: EM13323690

Questions Cloud

Determine which company the customer could buy each item : Design a polynomial time algorithm to determine which company the customer could buy each item from to minimize her total cost.
Calculate inner diameter if designing for max expected wind : For a steel stack that exhaust 1200 m^3/min of gases at 1atm and 400 K, calculate the inner diameter if you are designing for a maximum expected wind speed at the stack of 12m/s.
Write a c program that inputs several lines of multiple word : Write a c program that inputs several lines of multiple words, then a search character, and uses the function strchr to determine the total occurrences of the character in the lines of text.
Write a program that inputs several lines of text : Write a program that inputs several lines of text and a search character and uses function strchr to determine the total occurrences of the character in the lines of text.
Find the work done in the process and the final pressure : Assume 0.1 kg of air initially at 200 kPa and 300 K undergoes an isothermal compression process to a volume of 0.02 m3. Find the work done in the process and the final pressure. Sketch the process on a P-V diagram.
Determine the maximum shearing stress in each shaft : Knowing that G = 11.2 x10^6 psi, determine the maximum shearing stress in each shaft when a torque of T of magnitude 420kip*ft is applied to the flange indicated. And the torque T is applied to flange B.
Write an application that extends jframe : Write an application that extends JFrame and that displays a yellow smiling face on the screen. save file as JSmileFace.java
What is the linear speed of saturn : What is the linear speed of Saturn in its orbit about the sun? Give your answer in meters per second
Determine the value of the angle to the nearest second : A horizontal angle was measured by repetition six times with a total station. If the initial display reading was 21o33'18" and the final reading was 129o20'04", determine the value of the angle to the nearest second.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the total length-depth of the pile

Using a safety factor of 2.00 and neglecting the pile dead weight, find the length of a 1' diameter circular concrete pile required to take a design load of 50 kips in a soil composed of two layers.

  Shafts in a speed-reducer unit

The two shafts in a speed-reducer unit are subjected to couples of magnitude M1 = 18 N · m and M2 = 7.5 N · m, respectively.

  How is nitrate related to tn and tkn

Show that the drinking water standard of 10 mg/L nitrate as nitrogen is equivalent to 45 mg/L nitrate. How is nitrate related to TN and TKN?

  Explain transportation network

Transportation network, A power generator at a dam can send 300 megawatts to substation 1, can send 200 megawatts to substation 2, and can send 250 megawatts to substation 2

  Find what diameter pipe is required to triple the capacity

Given an 18-in. concrete conduit with a roughness coefficient of n = 0.013, s = 0.02, and a discharge capacit of 15 cfs, what diameter pipe is required to triple the capacity

  Find what is the flow in cfs if the pressure at 3 diameter

Oil (specific gravity 0.752) flows through a 6" horizontal pipe under a pressure of 60 psi. Assuming no losses, what is the flow in cfs if the pressure at a 3" diameter reduction is 20 psi

  Calculate the chohesion of the clay in the natural states

A vane, 10 cm long and 8 cm in diameter, was pressed into soft clay at the bottom of a bore hole. Torque was applied and gradually increased 45 N-m when failure took place. Subsequently the vane rotated rapidly so as to completely remould the soil..

  Find excess solids production of extended aeration process

Estimate teh excess solids production of an extended aeration process treating unsettled wastewater with a BOD of 200 mg/l and suspended solids concentration of 240 mg/l, assuming k=0.35.

  What is the uniform flow in cfs when the pipe is half full

A concrete (n=0.013) stormwater channel, 6-feet in diameter, has a bed slope of 0.01%. What is the uniform flow in cfs when the pipe is half full

  Find period of vibration and max acceleration of cylinder

A 30 lb uniform cylinder can roll without sliding on a 15 degree incline. A belt is attached to the rim of the cylinder, and a spring holds the cylinder at rest. If the center of the cylinder is moved 2 in.

  What diameter is required if the concrete pipe is to carry

A ciricular sewer is laid on a slope of 0.5%. What diameter is required if the concrete pipe is to carry 25 cfs If the desired design mean suction velocity is between 3 and 7 ft/s, is the design acceptable

  Determine what would be the coefficient of permeability

hydraulic conductivity of soil is .009cm/sec at room tmeperature of 28*C. what would be the coefficient of permeability at 20*C

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd