Find the voltage gain-current gain and power gain

Assignment Help Electrical Engineering
Reference no: EM13259179

An amplifier operates from -5V and +5V balanced power supplies. It provides a 3.2-Vpeak sine across a 150 ohm load when provided with a 0.2-V peak input from which 2.0mA peak is drawn. The average current in each supply is 20mA.

Find the voltage gain, current gain, and power gain expressed as ratios in dB.

Find the supply power, amplifier dissipation, and amplifier efficiency.

Reference no: EM13259179

Questions Cloud

What was the angular acceleration during given time : Starting from rest, a disk rotates about its central axis with constant angular acceleration. In 5.0 s, it rotates 45 rad. What was the angular acceleration during this time
Explain naoh to neutralize the excess : A 0.2527-g sample of a mixture of Mg(OH)2 and Al(OH)3 was treated with 50.00 mL of 0.225 mol L 1 HCl(aq). The resulting solution required 13.73 mL of 0.176 mol L 1 NaOH(aq) to neutralize the excess, unreacted HCl.
Explain impact of transaction on other financial statements : The consideration paid to the seller was made entirely by transferring title of Treasury Stock to them? Where else would we see the impact of this transaction on the otherfinancial statements?
How much of mileage is deductible : Assuming Courtney works 49 weeks during the year, how much of her mileage is deductible?
Find the voltage gain-current gain and power gain : An amplifier operates from -5V and +5V balanced power supplies. It provides a 3.2-Vpeak sine across a 150 ohm load when provided with a 0.2-V peak input from which 2.0mA peak is drawn. The average current in each supply is 20mA.
With what speed does he leave the sled : For a movie scene, a 76kg stuntman drops from a tree onto a 51kg sled that is moving on a frozen lake with a velocity of 13m/s toward the shore. with what speed does he leave the sled
What is the net advantage of leasing : The lease terms, call for a $10,000 lease payment (4 payments total) at the beginning of each year. DTC's tax rate is 40%. Should the firm lease or buy?
Ending work in process inventory : There were 7,500 units in the department's beginning work in process inventory, two thirds complete with respect to conversion costs. During March, 52,500 units were started and 50,000 were completed and transferred out of the department. The endi..
Explain a copper wire is strectched with a stress : a copper wire is strectched with a stress of 10ksi at 20deg C. If the length is held constant, to what temperature must the wire be heated to reduce the stress to 5ksi

Reviews

Write a Review

Electrical Engineering Questions & Answers

  Evaluate the pros and cons of using the snr and signal

Which of these metrics are dependent on link conditions: CINR, SNR, or BER Evaluate the pros and cons of using the SNR and signal - to - interference - noise ratio ( SINR ) for estimating signal quality versus using the absolute value of the signa..

  Determine p-type body doping concentration na for voltage

Write an equation to help determine P-type body doping concentration Na for a required threshold voltage V (sub TN) for an N-channel Al-Sio(sub 2) -Si MOSFET. Use the equation to design an N-MOSFET with a thershold voltage of 10V

  Compare the area-delay and power of the adders

Design a 16 bit adder using both the ripple carry and CLA methods. Use 4-bit CLA blocks for the carry-lookahead design. Use only two-input logic gates in your design. Simulate the design using LogiSim at the logic gate level.

  Display a flashing light to alert the operator

If a third attempt is made within 20 seconds, a waiting period of 20 seconds is required before additional attempts can be made to start the motor. While waiitng to make additional attempts to start the motor.

  Estimate the optical generation rate of ehps per second

(a) A Ge bar 0.1 cm long and 100 m2 in cross-sectional area is doped with 1×1017 cm-3 gallium. Find the current at 300 K with 10 V applied. (b) Upon a steady illumination uniform excess carriers are generated in the Ge bar.

  What is the minimum number of pins required for a socalled

What is the minimum number of pins required for a socalled dual-op-amp IC package, one containing two op amps What is the number of pins required for a so-called quad-opamppackage, one containing four op amps

  Find the zero input response as a function of time

Consider a series RL circuit with a voltage source. Take the output as the voltage across the resistor with L = 2 henrys and R = 4 ohms. (a) Find the zero input response as a function of time. The initial current is 2 A.

  What is the impulse response of the overall amplifer

Consider an ideal op-amp in inverting amplifier configuration with feedback impedance Rf=7ohms and an input impedance consisting of a series RL: Ri=9ohms and Li=5H. Let h(t) be the impulse response of the overall amplifer.

  Find the closest distance to the load plane

A 50 ohmlossless air transmission line is terminated in a load impedance ZL = 12.5 + j20 ohm. Find the following using a Smith Chart: the load admittance YL. the closest distance to the load plane where the normalized admittance on the line is 1 + j..

  Develop a register file that has 8 5-bit registers

Develop a register file that has 8 5-bit registers. The user can read or write to any of the 8 locations. Develop a state machine that causes the ALU to perform the operations and store the results to the registers.provide de VHDL code ths\is

  How long will it take for all of the energy to be drained

A 20 uF capacitor has a voltage of 12V across it at t=0. If a constant current of 4mA flows through the capacitor in the non-passive direction, how long will it take for all of the energy to be drained from the capacitor

  Define bipolar junction transistor

Bipolar Junction Transistor, A silicon n-p-n bipolar junction transistor is designed with emitter, base and collector doping levels of 10^19cm, 10^15cm and 5*10^17cm, respectively.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd