Find the total income for the optimum number

Assignment Help Mathematics
Reference no: EM132080304

A construction Company has an expenditure rate of E'(x)=e^0.17x dollars per day on a particular paving job and an income rate dollars per day on the same job, where x is the number of days from the start of The job. the company's profit on that job will equal total income less total expenditures. profit will be maximized if the job ends at the optimum time which is the point where the two curves meet. A) find the optimum number of days for the job to last B) find the total income for the optimum number of days C) find the total expenditures for the optimum number of days D) find the maximum profit for the job

Reference no: EM132080304

Questions Cloud

Discuss merits of and problems with the manager statement : Discuss the merits of and problems with the manager's statement.
What is the? distance : the golfer turns 105° toward his ball. He then paces off 44 yards to his ball. See figure. How far is it to the center of the? green?
Assignment-sequences and series : For problems 1-5 determine if the sequence is arithmetic, geometric, or neither. Explain your answer in 1-2 complete sentences.
What is the minimum value of f : Consider this function for the following questions: f(x) = x3 - 9.5x2 - 14x + 6. Report all values to exactly one decimal place.
Find the total income for the optimum number : find the total income for the optimum number of days C) find the total expenditures for the optimum number of days D) find the maximum profit for the job
Find the area between the curves : Find the area between the curves. Y=x^10/9,y=8x^1/9 The area between the curve is _______? (Do not round until the final answer.
Find the area between the curves : Find the area between the following curves. X=-2,x=2, y=e^x, and y=3-e^x (Type the answer in terms of e) Set up the integral(s) needed to compute this area.
Determine the cost involved to increase production : If c is in dollars, determine the cost involved to increase production from 90 to 180 units
Sketch the region in the first quadrant that : Sketch the region in the first quadrant that is bounded by the given curves. Approximate the area of the region by the indicated sum.

Reviews

Write a Review

Mathematics Questions & Answers

  Questions on ferris wheel

Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.

  Logistic map

This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.

  Finding the probability of cards

This assignment has questions related to probabiltiy.

  Systems of ode

Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.

  Derive the boolean expression

Derive the Boolean Expression and construct the switching circuit for the truth table stated

  System of equations

Evaluate which equations are under-identified, just-identified, and over-identified.

  Linear programming problem

Linear programming problem consisting of only two constraints with one objective function.

  Find the natural domain

Find the natural domain of the given functions.

  Introduction to numerical methods

Compute the coecients of the polynomials using the term recurrence relation.

  Chart of the topological manifold

De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.

  Mathematics in computing

Questions related on mathematics in computing.

  Complex problems

Complex problems

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd