Find the total head loss if the flow velocity

Assignment Help Civil Engineering
Reference no: EM13542322

Water at 72 degress Fahreneit flows through a 110-ft-long, 5-in-diameter wrought-iron pipe that contains the following fittings: one open globe valve, one medium-radius elbow, and one 90 degrees pipe bend (kb=0.13) with a radius of curvature of 45 in. The length of the bend is not included in the 110 ft. There are no entrance or discharge losses. Find the total head loss if the flow velocity is 4.8 fps.

Reference no: EM13542322

Questions Cloud

Calculate the viscous drag force on this plate : An engineer is designing a horizontal, rectangular conduit that will be part of a system that allows fish to bypass a damn. Inside the conduit a flow of water at 40 F will be divided
Compare the effectiveness of the zinc coating with a typical : Compare the effectiveness of the zinc coating with a typical epoxy coating on reinforcement. How does the epoxy coating protect reinforcement and what happens if the coating is nicked.
Consecutive wet days with a probability of occurence : During the rainy season in a tropical country, the probability of a day being dry is 0.10. A dry day is defined as one without significant rainfall. Assuming that the number of days until the next dry
What are the specifications need to be specified while creat : What are the specifications need to be specified while creating a design for waterways?what are their uses?how are they maintained?
Find the total head loss if the flow velocity : Water at 72 degress Fahreneit flows through a 110-ft-long, 5-in-diameter wrought-iron pipe that contains the following fittings: one open globe valve, one medium-radius elbow
Find the flow rate and the pressure head at the base of : An 8-in-diameter pipeline (f=0.028) 500 ft long discharges a 3-in-diameter water jet into the atmosphere at a point that is 250 ft below the water surface at intake.
Find the pressure head just upstream of c and just down : A pipeline 900 ft long discharges freely at a point 200 ft lower than the water surface at intake. The pipe intake projects into the reservoir. The first 600 ft is of 10-in diameter, and the remaining 300 ft is of 6-in diameter. Find the rate of disc..
Find the rate of discharge of water at 60 degrees fahreneit : Three new cast iron pipes, having diameters of 24, 21 and 18 in respectively, each 450-ft long, are connected in series. The 24-in pipe leads from a reservoir (flush entrance), and the 18-in pipe discharges into the air at a point 15 ft lower than th..
What percentage is this loss reduced if the provision : Water leaves a turbine at 18.5 fps and enters a tailrace having an average velocity of 1.5 fps. What is the submerged discharge head loss? By what percentage is this loss reduced if the provision of a draft tube increases the discharge flow area to s..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate compressive capacity using australian standard

A client has engaged your consultancy company to undertake a conversion of a warehouse to a residential dwelling in the northern city of Darwin. You are required to check the capacity of a proposed column to ensure it can support a mezzanine floor..

  Determine the spring constant k required for equilibrium

The 81-lb uniform square plate is supported by a ball-and-socket joint at O, a cable at E, a fixture at A which can support vertical force only, and a linear spring at C. If the unstretched length of the spring is 4 in.

  Determine the dimensions of the best hydraulic section

A semicircular open channel to be made of concrete is to be designed to carry 1.5 m^3/s at a slope of 0.00085. Manning's roughness coefficient is 0.015. Determine the dimensions of the best hydraulic section.

  Find diameter of the shaft for maximum rotation in a and c

The uniform steel shaft has two gears attached to it at B and C, two frictionless bearings, and the motor. The motor generates 15kip·in and the gears consume 10kip·in and 5kip·in. Find the diameter of the shaft if the maximum rotation between A an..

  Determine the activated sludge aeration volume required

Determine the activated sludge aeration volume required to treat 2.64 mgd with a BOD of 120 mg/l based on the criteria of a maximum BOD loading of 40 lb/1000 ft cubed/day and a minimum aeration period of 5 hr.

  Calculate the equivalent uniform annual cash flow

Annual rare based on amount of products which can ordinarily be shipped each year as a function of the amount of vehicles or service purchased with the first cost and the M&O costs.

  What is the value of x when block comes to rest momentarily

The block is released from rest when the spring is unstretched (at x=0). We wish to show that the ensuing motion of the block is simple harmonic. Call the initial configuration of the system that existing just as the block is released from rest.

  How to design codes which deal with shear friction

However, design codes which deal with shear friction design place an upper limit on the magnitude of the shear force for which the plane can be designed. Explain why this is so.

  Geophysical techniques using electromagnetic induction

Describe the application of geophysical techniques using electromagnetic induction as a tool for sustainable soil and water management of agricultural fields in the humid tropic Caribbean 300 word limit.

  Determine the density of the traffic stream in the lane

you measure the average headway and average spacing of passing vehicles as 3.2 seconds and 165 ft, repsectively. calculate the flow, average speed, and density of the traffic stream in this lane.

  Calculate the detention time

As a consulting engineer you are hired to evaluate the operation and the unit processes within the plant and make recommendations for improvements. You are asked to consider the following units.

  What is the rate of evapouration of water

what is the rate of evapouration of water from a reservoir with air temp at 20c and the surface of reservoir is 3000m2.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd