The annual demand for an item is 2400 units. The inventory holding cost is $ 6.00 per unit per year. The demand is continuous and constant, that is, 200 units/month. The item is purchased in two lots. The size of the first lot is 1600 units and the size of the second lot is 800 units. Find the total annual cost of holding inventory.

Reference no: EM13249887

Questions Cloud

What is the activitys slope : Given that an activity's normal time and cost are ten days and $400, and its crash time and cost are five days and $800, what is the activity's slope?
Determine what will be carrier frequency variation : A 5-volt intelligence amplitude causes the frequency to change to ± 25 kHz. What will be the carrier frequency variation corresponding to an intelligence amplitude of 10 volts
Explain what happen if a change is made in the gas pressure : A gas sample has an original volume of 580 ml when collected at 1.20 atm and 22°C. If a change is made in the gas pressure which causes the volume of the gas sample to become 1.45 liters at 40°C, what is the new pressure
Determine the temperature at the center of the asteroid : Conside a spherical asteroid (radius 10km and constant mass density 3g/cm^3). The core extends to 3km, Determine the temperature at the center of the asteroid
Find the total annual cost of holding inventory : The size of the first lot is 1600 units and the size of the second lot is 800 units. Find the total annual cost of holding inventory.
Explain what will be the volume of the gas sample : A gas sample has an original volume of 680 ml when collected at 720 mm and 28°C. What will be the volume of the gas sample if the pressure increases to 820 mm and the temperature increases to 55°C
Write matlab command to plot magnitude and phase response : Use the above transfer function and BLT to design a corresponding IIR digital lowpass filter with a cutoff freqency of 15 Hz and a sampling rate of 120 Hz. a. Write the transfer function of the digital filter.
Design a second-order band-pass iir filter with centre freq : Design a second-order band-pass IIR filter with center frequency of 450 Hz when the sampling frequency is 2,000 Hz. In order to ensure the filter stability, set the poles at 0.96 radial distant from the origin
Define how many moles of nh4no2 would be required to form n2 : How many moles of NH4NO2 would be required to form 25 grams of N2 in the following reaction

Reviews

Write a Review

Operation Management Questions & Answers

  How many boxes of each size should the banks design

The bank believes it wil need at least 350 total boxes, at least 80 of which should be large. IT hopes to maximize revenue for safety deposit boxes. How many boxes of each size should the banks design provide?

  Describe the global standardization

Describe the global standardization--local adaptation debate. What are the drivers for globalization and for adaptation? 250 word Explaination.

  What are the major options for appraisal of employees

What are the major options for appraisal of employees? Discuss each option, identifying the one that you think is best and why you chose that option.

  Provide your customers with a tiered service system

If you owned your own business, would you provide your customers with a tiered service system? Why or why not?

  Discuss the advantages to locating manufacturing-assembly

Discuss the advantages to locating manufacturing, assembly or distribution facilities in countries with relatively low wages.

  Which will be completed in two separate components

Students will choose leader/s for the purpose of completing the applied project, which will be completed in two separate components (Mid Term and Final)-see syllabus, each of which will be evaluated separately.

  Develop a joint probability table

Develop a probability tree showing all marginal, conditional, and joint probabilities.

  Formulate an integer programming model

2 new fire stations are to be located in a city and the major of the city wants to decide where to locate the 2 fire stations. For planning purposes, the region has been divided into five tracts.

  The national state bank is trying to make sure enough teller

The National State Bank is trying to make sure that they have enough tellers to handle the Friday afternoon rush of workers wanting to cash their paychecks

  Compare and contrast test marketing and roll out

Compare and contrast test marketing and roll out. Describe two forms of roll out for a new vacuum cleaner. support your choice.

  What is your break-even point in dollars

What is your time utilization based on the above? If you charge $3 per 6 pretzels and fixed costs are $10 per day, what is your break-even point in dollars?

  Develop a dollar-averaging budget for future purchases

Suppose, at the time of the purchases, the actual prices per lb for the next 4 months turn out to be $1.32, $1.05, $1.10, and $0.95, respectively. If dollar averaging is used, what quantities should be purchased in each month? Is there any advanta..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd