Find the time t elapsed during the specified interval

Assignment Help Civil Engineering
Reference no: EM131202713

A certain lake is proposed as a landing area for large jet aircraft. The touchdown speed of 100 mi/hr upon contact with the water is to be reduced to 20 mi/hr in a distance of 1500 ft. If the deceleration is proportional to the square of the velocity of the aircraft through the water, a = Kv2, find the value of the design parameter K, which would be a measure of the size and shape of the landing gear vanes that plow through the water. Also find the time t elapsed during the specified interval.

Reference no: EM131202713

Questions Cloud

Determine the moment created by the two forces : Treat the problem as two-dimensional. The moment is positive if counterclockwise, negative if clockwise.
What particular polymer might you first consider : What additional information concerning the application and polymer properties do you
What deferred tax should be reported on the balance sheet : During its first year of operation a comany recoreded accured expense totaling $ 375,000 for book purposes. For tax purposes, $ 175,000 of th expense are deductible during the first year of operation and $ 200,000 are dedutible during the second year..
Write a summary of the given article : Read the attached article "The Laboratory idetity crisis that can't be esolved with science".- write a summary of the given article:
Find the time t elapsed during the specified interval : find the value of the design parameter K, which would be a measure of the size and shape of the landing gear vanes that plow through the water. Also find the time t elapsed during the specified interval.
What amount of deffered income tax liability : Simth company reported $ 350,000 in book income before income tex during 2015, its first year of operation. The tax depreciation exceeded its book depreciation by $ 30,000. The tax rate for 2015 and future years was 4%. what amount of deffered income..
Prepare a schedule of cost of goods manufactured : ACC200 Introduction to Management Accounting - Prepare a Schedule of Cost of Goods Manufactured and Cost of Goods Sold. (The schedules may be in the appendix). Explain why some cost items have been excluded from the schedules.
At what speed vb should he proceed : The experienced ferry captain wishes to minimize the effects of the wind on the passengers who are on the outdoor decks. At what speed vB should he proceed?
What are the total equivalent units for direct-materials : At Sunrise? Corporation, direct materials are added at the beginning of the process and conversions costs are uniformly applied. Other details? include: WIP beginning? (50% for? conversion)?19,200 units. Units started ?120,500 units. What are the tot..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Would stainless screen have sufficient collapse strength

The saturated unit weight (sat) of the sand is 20.0 kN/m3 and the anticipated depth to water in the well during pumping is 20 m below ground surface.

  At which the driver could apply the brakes and still stop

The road is in good, dry conditions until 160 ft before the stalled car where it is wet and stays wet for the remaining length. What is the minimum distance from the stalled car at which the driver could apply the brakes and still stop before hitt..

  Calculate the critical depth of a circular concrete pipe

calculate the critical depth of a circular concrete pipe with a diameter of 42 inches, a Manning's Number of .014, a slope of .025% and a flow rate of 10 CFS (cubic feet per second). The radius is 3.55 and normal depth is 25 inches

  Can a code word be decoded as soon as its last bit arrives

Show that suffix-free codes are uniquely decodable. Use the definition of unique decodability in Section 2.3.1, rather than the intuitive but vague idea of decodability with initial synchronization

  Find magnitude of the total acceleration of roller coaster

the roller coaster track consists of a circle in a vertical plane of radius 150m. find the magnitude of the total acceleration of the roller coaster if, at the time shown, the car is moving at 50 km/hr and is gaining speed at the rate of 0.4g

  Describe the water surface profiles at the various parts

.Water enters a very wide rectangular channel (Manning’s n = 0.0149) at a velocity of 12.2 ms-1 and a depth of 0.61 m. An H3 curve forms downstream and the water jumps to a depth of 2.4 m some distance downstream. Find the distance downstream to the ..

  An observer fails to check the bubble and it is off two

A piston-cylinder device initially contains 1.4 kg saturatedliquid water at 200 C. Now heat is transferred to the water until the volume quadruples, and the cylinder contains saturatedvapor only.

  Calculate the area of each filter in constructing rapid sand

Estimate the number of filters required and calculate the area of each filter (ft2), assuming that a length-to-width ratio (L:W) of 4:1 is employed in constructing the rapid sand filters and suing a filtration rate of 6 gpm/ft2.

  Stability of the building from the construction of a canal

If the owner insists on constructing the canal, research methods that you would consider so that the canal can be designed and constructed safely.

  Calculate the amount of water to be added per cubic meter

An undisturbed soil sample has a total unit weight of 19.4 kN/m3, a dry unit weight of 16.9 kN/m3, and a specific gravity of soil solids (Gs) of 2.69. If the sample could be saturated without changing its porosity, calculate the amount of water (i..

  Which subcontractor will provide the flooring

With regards to elevator cabs, which subcontractor will provide the wall finishes? Which subcontractor will provide the flooring?

  What is the head that must be added by the pump

The moist unit weight of a soil is 19.kN/m^3. Given that specific gravity is 2.72 and water content is 10.6%, calculate dry unit weight, void ratio, porosity, and degree of saturation.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd