Find the swell and shrinkage and load and shrinkage factors

Assignment Help Civil Engineering
Reference no: EM13314154

material (LCY) in 12 yard dump trucks, placing it, and compacting the weight of the soil is 3,750 lb/cu.yd. (30 pts.) (show your calculations)
a) Find the Swell and Shrinkage
b) Load and Shrinkage Factors
c) A 165,000 cu. ft. pond is to be constructed. How many truck loads are necessary if you use

Reference no: EM13314154

Questions Cloud

Calculate the length of filament that you need : You are to design a tungsten filament light bulb that has a power of 60W when it is connected to 120V at which condition its temperature is expected to be 1020C. Calculate the length of filament that you need
Explain the empirical formula of the compound : A certain ionic lattice consists of a ccp sublattice of cations. The anions occupy all of the tetrahedral sites. What is the empirical formula of the compound
Estimate the maximum total power needed : Squaw Valley ski area in California claims that its lifts can move 48300 people per hour. estimate the maximum total power needed
How many grder hours will be required to accomplish the job : A motor grader will require 2 pases at 3 mph., 2 pases at 4 mph., and 2 passes at 5.5 mph. to accomplish the work How many grder hours will be required to accomplish this job if the job efficiency factor is 0.75.
Find the swell and shrinkage and load and shrinkage factors : material (LCY) in 12 yard dump trucks, placing it, and compacting the weight of the soil is 3,750 lb/cu.yd. (30 pts.) (show your calculations) a) Find the Swell and Shrinkage b) Load and Shrinkage Factors
Explain the reaction mixture is neutralized with naoh : In the work-up procedure the reaction mixture is neutralized with NaOH (aq) and then extracted twice with diethyl ether. Explain why this is done. This was for an OChem Menthone lab.
Find the minimum length of runway required for the landing : Find the minimum length of runway required for the landing (I found to be 300ft). Find the position on the runway where the speed is 50ft/s and the time it takes for the speed to reach 50ft/s
Why is the order of the execution of two processes important : Modify the code so that the senderReceiver process sends then receives repeatedly suspending itself for 3 seconds between each iteration.
How far does the vehicle travel from start to stop : An electric vehicle starts from rest and accelerates at a rate a1 in a straight line until reaches a speed of v.  How far does the vehicle travel from start to stop

Reviews

Write a Review

Civil Engineering Questions & Answers

  Plot the normalized concentration versus normalized time

Write the mass balance equation for a completely mixed lake with an impulse input of mass, M, added at time t = 0. Assume the lake is of constant volume, V, with continuous outflow, Q, and a conservative substance.

  Determine the perpendicular distance d from the line

A line passes through the points (22 m, 19 m) and (-2 m,-5 m). determine the perpendicular distance d from the line to the origin O of the system of coordinates.

  Find the moment of inertia and natural frequency of pipe

Find the moment of inertia and natural frequency of a vertical cantilever pipe 12 feet tall with outer diameter of 4.5 inches and an inner diameter of 4.25 inches. Modulus of Elasticity = 10*10^6 Mass = 50 lbs.

  Specify the amount of convective acceleration

shaped nozzle such that the velocity along the center line of the flow increased from 1.5 m / s to 15 m / s at a distance of 37.5 m. specify the amount of convective acceleration at the beginning and end of the range.

  What is the risk of constructing a harbor

What is the risk of constructing a harbor which will be unprotected from wave attack during its construction.

  Explain how to determine the max height of a brick wall

Assuming a density of 120/ft^3 for masonry brick work, determine the max height of a brick wall if the allowable compressive stress is limited to 150/in^2 and the brick is a) 4" wide b) 6" wide.

  Describe at least four basic features of cpm software

Describe the problem of lack of coordination between design and construction in a traditional contract. In agency CM,what expertise does the CM provide during the pre-design and design phase.

  Determine the amount of natural alkalinity consumed

jar tests were perfomed on untreated river water. an optimum dose of 12.5 mg/L of alum was determined. determine the amount of natural alkalinity (mg/L as CaCO3) consumed.

  Design a shore river intake system in a cold climate

Provide the minimum number of ports. The design conditions are: Winter design fl ow rate  4,300 m 3 /d Minimum river elevation held constant by lock and dam system  99.0 m 500-year fl ood elevation  113.3 m River bottom elevation  90.4 m

  Determine what is the maximum flow rate that can be pumped

assume the pipe diameter is 4-inches, (f = 0.035), Distance from BC is 15-feet, distance DE is 180-feet and z = 60-feet. The elevation of C is 10-feet above the lower water surface.

  How much of the borrow material is required to fill the site

The material is brought from a borrow site that has yt=19.5 kn/M63 with w=16.5% and Gs=2.70 How much of the borrow material (in cubic meters) is required to fill the site  How heavy is it

  Determine what is the removal efficiency of the incinerator

A hazardous waste incinerator is to burn 200 Kg/h of PCB waste that is 30 % PCB and 70 % organic solvents. During testing phase, the concentration of PCB in the emission was recorded as 0.025 g/ m³

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd