Find the swell and shrinkage

Assignment Help Civil Engineering
Reference no: EM13559061

Clay weights 3,000 lb/cu. yd. on its natural state(BCY). After excavating the soil weight is 2,310 lb/cu. yd. After transporting the loose material (LCY) in 12 yard dump trucks, placing it, and compacting the weight of the soil is 3,750 lb/cu.yd.(show your calculations)

a) Find the Swell and Shrinkage

b) Load and Shrinkage Factors

c) A 165,000 cu. ft. pond is to be constructed. How many truck loads are necessary if you use

Reference no: EM13559061

Questions Cloud

Estimate how much weight can be lifted : A force of 250N is applied to a hydraulic jack piston wth a0.1m diameter. If the output piston, which supports the load,has a diameter of .5m,  how much weight can be lifted
Determine the reactor basin volume : An activated sludge plant is to be designed for a population of 4000 persons. The influent flow is 380 Lpcd and the influent BOD5 is 200 mg/L. Pertinent data are: Primary clarifier removes 33% of the influent BOD5, and the state regulatory agency all..
Assignment method related to production scheduling : What is the importance of the assignment method related to production scheduling?
How much weight can be lifted : A force of 250 N is applied to a hydraulic jack pistonwith a 0.1m diameter. If the output piston, which supportsthe load, has a diameter of 0.5m, How much weight can be lifted
Find the swell and shrinkage : Clay weights 3,000 lb/cu. yd. on its natural state(BCY). After excavating the soil weight is 2,310 lb/cu. yd. After transporting the loose material (LCY) in 12 yard dump trucks, placing it, and compacting the weight of the soil is 3,750 lb/cu.yd. (sh..
What is the speed of thegrain of sand : The de Broglie wavelength of a 1 mg grain of sand being blownby the wind is 3x10-29 m. What is the speed of the grain of sand
Project management as a method has been used in building : Project management as a method has been used in building projects
How many trucks are required and what is the production : On a shovel/truck operation the production of the shovel is 293 BCY/h and a job efficiency of 0.75. The trucks used have a capacity of 12 BCY and have a cycle time of 45 min.(excluding loading).
How long does it take this object to pass the ship : a spaceship whose rest length is 350m has a speed of .82c withrespect to a certain reference frame. how long does it take this object to pass the ship

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd