Producing an item requires 6 different tasks. Let tj denote the time (in seconds) to complete task j. We have: t1 = 30, t2 = 25, t3 = 35, t4 = 40, t5 = 15, t6 = 30. You would like to divide the tasks to 4 workers to constitute a production line. a. Find the production capacity of the line for the following assignment: Worker 1 → Task 1, Worker 2→ Task 2, Worker 3→Tasks 3,4, Worker 4→ Tasks 5,6. b. Find optimal assignment (to maximize the production capacity) if the task sequence should not be broken (task j should be done before task j +1). c. Find optimal assignment (to maximize the production capacity) if the task sequence can be broken (no precedence relationship between tasks). 1 d. Assume that the daily demand for this item is 400 and that each worker costs 15 TL/hr. Find the direct labor cost per item if the task sequence should not be broken. Please do not solve it with computer-aided programs.
In many cases, the problems of outright acquisition can be avoided while at the same time mutual goals can lead to the commitment of many more resources than in the case of arm's-length transactions. Strategic alliances typically lead to long- ter..
Calculate the Expected Utility for all alternatives
The Marlin Company operates 50 weeks a year, and its cost of goods sold last year was $1,800,000. The firm carries six items in inventory: three raw materials, two work-in-process items, and one finished good. What is their average aggregate inventor..
Stephanie Robbins is the Three Hills Power Company management analyst assigned to simulate maintenance costs. In Section 13.6 we describe the simulation of 15 generator breakdowns and the repair times required when one repairperson is on duty per shi..
define and discuss the open shop movement. include a specific example and analyze its success or failure and why. write
Looking to the future, what value-added components could Blockbuster offer potential partners to enhance its position in the environmnet?
For a machine, design capacity is 50 cords per day, effective capacity is 40 cords per day, and actual output is anticipated to be 35 cords per day. What would be its utilization? What would be its efficiency?
The textbook discusses the concepts of validity and reliability. Locate a research study, print it & conduct a critique on whether the study contains validity and whether it has reliability. Explain why or why not?
After reviewing the case study, construct a written paper that addresses the following: Explain organizational theories evidenced in this case study. Analyze how Texas Health Harris Methodist-Cleburne is a learning organization.
Non-Value Adding Activity For A Car Manufacturer
A renovation of the gift shop at Orlando Amway Center has six activities (in hours). For the following estimates of a, m, and b calculate the expected time and the standard deviation for each activity
Illustrate what factors must be considered in assessing legal sufficiency of an offer, acceptance and consideration in determining whether a contract is enforceable.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd