Find the pile capacity you would expect

Assignment Help Civil Engineering
Reference no: EM132248365

Problem - Consider the example problem given in Schroeder et al. on p. 220 (attached) that concerns capacity of driven pile in clay. Find the pile capacity you would expect if you used 18 in square pile instead of the 12 in square pile in the example.

Hint: you only need to modify the calculation given in the example where the size of the pile is a consideration. Recognizing this will save you much effort.

What are other factors that may be involved in deciding if increasing the pile size is desirable?

Attachment:- Example Problem.rar

Verified Expert

The question is about the calculation of capacity of piles.Here by using a set of formulas we have derived the solution for capacity.Finally based on the condition it is proved that the pile length is the desirable one.

Reference no: EM132248365

Questions Cloud

Correlation between the returns of well-diversified stock : If you put $3,000 into this portfolio for 30 years starting today, how can I calculate the expected value of the portfolio at the end of the 30th year?
What are the after-tax cash flows associated : a) What are the after-tax cash flows associated for each relevant period?
Create a graph to analyze the data you have collected : For each issue, create a graph or chart to analyze the data you have collected. Cite at least five credible sources excluding Wikipedia, dictionaries.
Find the pile capacity you would expect : Consider the example problem given in Schroeder et al. (attached) that concerns capacity of driven pile in clay. Find the pile capacity you would expect
Calculate the npv of the project : If the appropriate discount rate is 15 percent, how do I calculate the NPV of the project?
List the title and briefly describe the job : EXP105 - Building your Career Pathway : Describe the three tasks or responsibilities you most enjoyed. Decode each task or responsibility that you listed.
Car wash in affluent suburb of major metropolitan area : Jane Dow recently opened a new car wash in an affluent suburb of major metropolitan area. What is the bottleneck resource of the car-wash service.
Present value dollars of buying the truck : Assuming Aldo plans to exercise the purchase option, how do I calculate the present value dollars of buying the truck outright or acquiring it via the lease/buy

Reviews

inf2248365

8/21/2019 2:20:49 AM

Very happy with the work I must have to say that expert has clearly provided all steps on the calculations. I got full marks in my assignment.

inf2248365

8/21/2019 2:18:51 AM

Please provide a solution for problem 2. Calculations need to be as per the example. You can use the example but make sure that there should not by any repetitions of the steps because then the answer will not match with the requirement of the questions.

Write a Review

Civil Engineering Questions & Answers

  Average velocity and crosssectional area

Calculate the average velocity (rnps), crosssectional area (rn"), and depth (m) for the stretch. To make these estimates, assume that the stretch can be idealized as a rectangular channel.

  Determine the coordinates of the point

A golfer is out of bounds and in a gulley. For the initial conditions shown, determine the coordinates of the point of first impact of the golf ball. The camera platform B is in the plane of the trajectory.

  Determine the valve loss coefficient needed for h

Determine the valve loss coefficient needed for h=20 ft. All losses except for the flow control valve are negligible. The area of the pipe is 5 times the area of the exit nozzle.

  Ehermal conductivity of the radioactive wastes

The outer surface of the tank is cooled by air at 300 K with a heat transfer coefficient of 100 W/m2K. Determine the maximum temperature in the tank. Take the thermal conductivity of the wastes as 2.0 W/mK.

  Find the z centroid for the cone the scoop of ice cream

A single-scoop ice cream cone is a composite body made from a single scoop of ice cream placed into a cone.  Assume that the scoop of ice cream is a sphere with radius r=1.45in that is placed into a 4.00in tall cone.

  Determine the perpendicular distance d from the line to the

A line passes through the points (20m, 16m) and (-1m, -4m).  Determine the perpendicular distance d from the line to the origin O of the system of coordinates.

  What are biosynthetic pathways in cells anabolic produce atp

what are biosynthetic pathways in cells A) anabolic B) catabolic C) usually produce more atp than they consume D) release monmorsinto the cytoplasm

  Design a circuit to achieve the transfer function

Construct the straight-line Bode gain plot and estimate the cutoff frequency and passband gain.

  What is the stress along the top edge and the bottom edge

A horizontal pre-stressing force of 500kN is applied to rectangler beam. the beam has a depth of 500mm and a width of 250mm. the force is applied at a distance of 80mm below the x-x axis.

  Determine the maximum normal stress

If the cross section of the femur at section a-a can be approximated as a circular tube as shown, determine the maximum normal stress developed on the cross section at section a-a due to the load of 75 lb.

  What percentage savings is achieved by replacing single pane

The size of the house is 28ftx40ftx10ft. For simplicity, assume the roof is flat, covered with 1-in plywood plus asbestos shingles and has 3 1/2 in of fiberglass insulation. There is a wood subfloor (25/32 in) in the attic and a ahrdwood floor (3/..

  Determine the magnitude of the moment produced

The pipe assembly is secured on the wall by the two brackets. If the flower pot has a weight of 50lb, determine the magnitude of the moment produced about the x, y and z axes.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd