Steam locomotives require water at such rates that the storage tank behind the locomotive was refilled at 100 mile interverals. one technique used was to place a long tank between the rails and the water the water would be scooped up as the locomotive passed over the tank. The water level of the locomotive storage reservoir is 4 meters above the water level on the rails. find the minimum speed at which the train could pass over the tank and lift water up to teh full 4 m height.

(hint: consider the locomotive to be stationary and neglecting all losses)

Reference no: EM13563780

Questions Cloud

What is the minimum required temperture of the boiler : A coal fired steam power plant is to be designed for the purpose of generating electrical power for a city with a population of 60,000 residents. Based on an order-of-magnitude analysis
What is the total delay per cycle and delay per vehicle for : A left-turn movement has a maximum arrival rate of 200 veh/h. The saturation flow of this movement is 1400 veh/h. For this approach, the yellow time is 4 seconds, all red time is 2 seconds and total lost time is 3 seconds.
Determine the period and frequency of the motion : A 75-lb block is supported by the spring arrangement shown. The block is moved vertically downward from its equilibrium position and released. Knowing that the amplitude of the resulting motion is 2 in.,
Determine the normal capacity of the highway : Determine the normal capacity of the highway, the capacity of the highway upstream of the work zone, and the capacity within or in the vicinity of the work zone.
Find the minimum speed at which the train could pass over : Steam locomotives require water at such rates that the storage tank behind the locomotive was refilled at 100 mile interverals. one technique used was to place a long tank between the rails and the water the water would be scooped up as the locomotiv..
Determine the longest wait of any vehicle : An incident occurs on a freeway that has a capacity in the northbound direction, before the incident, of 4000 veh/h and a constant flow of 2900 veh/h during the morning commute.
What will be the approximate temperature of the alloy : Is it possible to have a copper-silver alloy of composition 50 wt% Ag-50 wt% Cu that at equilibrium, consists of α and β phases having mass fractions Wα = 0.60 and Wβ=0.40? If so what will be the approximate temperature of the alloy? If such an a..
How much heat has been transferred to the gas : A cylinder with a moveable piston holds .20 lb of hydrogen initially in a volume of 1 cu ft at a tem-perature of 1300 F. Then the volume is expanded to 2.5 cu ft while the gas pressure remains constant.
Estimate the power in watts that can be produced by : An engineer is considering the development of a small wind turbine(D=1.25m) for home applications.The design wind speed is 15mph at T=10 degree celsus and p=0.9 bar.The efficiency of the turbine is n=20%,meaning that 20% of the kinetic energy in the ..

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the rate of water rise in the lake in one day

A river discharges at a rate of 500 cfs into a lake. The water is drawn from the lake at a rate of 200 cfs. The surface area of the lake is 60 acres (1 acre = 43, 560 ft2). What is the rate of water rise in the lake in one day

  Determine the volume of stone required for each filter

A two stage high rate trickling plant is to treat a municipal wastewater having a flow of 2.0mgd. pertinent data: influent BOD5 = 200mg/l, BOD5 removal by primary clarifier = 33%, filter bed depth = 5 to 7ft,

  Find probability that specimen will contain detectable level

The article "Leachate from Land Disposal Residential Construction Waste" (authored by W.J. Weber, Y.-C Jang, T.G. Townsend, and S. Laux, Journal of Environmental Engineering, 128(3): 237 - 245, 2002) presents a study on contamination

  Evaluate fore bearing

True bearing of line is 300 and the magnetic declination is 30 W its magnetic bearing is what and Next If the back bearing of line is N 600 W its fore bearing is what ?

  Determine the coliform concentration of discharge effluent

The wastewater influent has a linear velocity of 0.5m/s and contains 3.0x10^5 fecal coliform colony unit (CFU) per liter. Determine the coliform concentration of the discharge effluent into Back river.

  Determine the cartesian coordinates of the anchor

A fisherperson, pulling on the anchor cord, causes a force on the man of F=(40i+20j-50k)N. If the cord is 30m long,determine the Cartesian coordinates of the anchor at A. Assume that cord OA is a straight line.

  Calculate the over consolidation ratio of the clay layer

From the results of an oedometer test on an undisturbed sample of clay taken at a depth of 10 m from the ground surface, the maximum vertical preconsolidation pressure (s’vmax or s’c) was found to be 560 kPa. The clay layer has a saturated unit weigh..

  Determine the percent reduction in the required force when

A 50 cm by 20 cm block weighing 150 N is to be moved at aconstant velocity of .8m/s on an inclined surface of 20 degreesfrom horizontal with a friction coefficient of .25.

  A tradiational school building project

A variety of procurement strategies are available to the construction clients under different circumstances. The common strategies adopted by international clients include deisgn-bid-build (DBB), design-and-build (D&B), management contracting (MC), c..

  Determine the actual field weight required to mix a 4 bag

Determine the actual field weight required to mix a 4 bag mix using the mix proportions given below. The excess moisture contet of the sand is 6% and that of the gravel is 2% Component Weight ..

  Determine the design load for strength and serviceability

Determine the design load for strength and serviceability limit states (short-term and long term), for a steel beam in a residential building with the following data;

  Find the point at which the line with parametric equation

Find the point at which the line with parametric equation x=2+3t, y=-4t, z=5+t intersects the plane 4x+5y-2z=18

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd