Find the maximum bending stresses

Assignment Help Civil Engineering
Reference no: EM13552923

A simply supported composite beam 3m long carries a uniformly distributed load of intensity q=3.0kN/m. the beam is constructed of a wood member, 100mm wide by 150mm deep, reinforced on its lower side by a steel plate 8mm thick and 100mm wide. Find the maximum bending stresses ? (wood) and ? (steel), in the wood and steel, respectively, due to the uniform load if the modulus of elasticity are E (wood)=10 GPa for the wood and E (s)=210 GPa for the steel.

Reference no: EM13552923

Questions Cloud

Construct a choice table for interest rates from 0% to 100% : A firm is considering moving its manufacturing plant from Chicago to a new location. The industrial engineering department was asked to identify the various alternatives together with the costs to relocate the plant, and the benefits.
Find the volume of the given solid region bounded : Find the volume of the given solid region bounded below by the cone z=sqrt(x^2+y^2) and bounded above by the sphere x^2+y^2+z^2=128. using triple intergrals
Determine this deflection and the proper offset d : The two I-beams are welded together and are initially supported by the three cables of equal length hanging vertically from supports directly above A, B, and C. When applied with the appropriate offset
Classify the jump type and calculate the energy lost : A rectangular channel of width 12 ft has an upstream slope of 0.02 ft/ft and a downstream slope of 0.0005 ft/ft. Both reaches have lengths of 500 ft. The upstream reach has a Manning's roughnes
Find the maximum bending stresses : A simply supported composite beam 3m long carries a uniformly distributed load of intensity q=3.0kN/m. the beam is constructed of a wood member, 100mm wide by 150mm deep
What will it be after consolidation is completed : The current vertical stress at a point in a saturated clay is 181 kPa. This soil is to be covered with a 2.5m thick fill that will have a unit weight of 19.3 kN/ m^3. What will be the value of the vertical
What is friction of k and how does it work into the reaction : A 400 lb crate is on a 20 degree incline. If a 120 lb horizontal force (P), pushes on the crate (upwards), determine the normal and frictional forces acting on the crate. Take friction of surface = 0.3 and friction of k = 0.2?
Determine the location of the hydraulic jump relative : A rectangular channel of width 12 ft has an upstream slope of 0.02 ft/ft and a downstream slope of 0.0005 ft/ft. Both reaches have lengths of 500 ft. The upstream reach has a Manning's roughness of 0.016 and the downstream reach has a roughness of 0...
Find the hydraulic conductivity of the aquifer : A confined aquifer 30 m thick has been pumped from a fully penetrating well at a steady rate of 5000 m3/day for a long time. Drawdown at an observation well 15 m from the pumped well is 3.0 m

Reviews

Write a Review

Civil Engineering Questions & Answers

  What the e stands for in our road numbering system

In the state of Oklahoma the county roads are designated with a number and a letter. E on roads extending east and west and S on roads extending north and south.Those roads traveling east and west are designated a number and the letter E

  Design a packed tower strpping column to meet requirements

a well is contaminant with 340 mg/L of tetrachloride ( perchloroethylene). the water must be remediated to achieve a concentration of 0.2 mg/L ( the detention limit ).

  What is the steady-state concentration of radon in the house

The total volume of the house is 650 m3 (assume that the volume is well mixed throughout). The radon source emits 250 pCi/s (A picoCurie [pCi] is a unit proportional to the amount of radon gas and indicates the amount of radioactivity of the gas)

  Find the work done in pumping the water

a horizontal cylindrical tank 4 ft in diameter and 10 ft long is full of water. find the work done in pumping the water to a point 4 above the top of the tank.

  Find the magnitude of the force on one side of plate

A rectangular plate 5ft by 4ft is at an angle of 30 degrees with the horizontal, and the 5-ft side is horizontal. Find the magnitude of the force on one side of the plate and the depth of its center of pressure when the top edge is (a) at the wate..

  Decide how many units would like to use and dimensions

The plant will be designed with a rapid mix unit followed by flocculation and sedimentation basin. The water source has an average winter water temperature of 40 and an average summer water temperature of 70oF.

  When its axis is parallel to the direction of stream flow

A bowling ball is dropped from a boat so that it strikes the surface of a lake with a speed of 25 ft/s. Assuming the ball experiences a downward acceleration of a = 10-9v2 when in the water, determine the velocity of the ball when it strikes the bott..

  Calculate the energy needed to bring the soil

We are digging a hole to build a building. Calculate the energy needed to bring the soil to surface level. Remember the sides of the excavation lie at 45 degrees. Else, the whole would be constantly refilling itself.

  Calculate how far the pump can be located from

A pump is to be installed in a straight horizontal pipe. The site is at an elevation of 20ft (essentially at sea level). The water temperature is 50F and the flow rate will be 5 cfs. The required NPSH is 15ft

  Design and detail the steel reinforcement for the section

a simply supported beam with a span of 8m is to carry, in addition to its weight, a superimposed dead load of 18kN/m and a live load of 30kN/m both over the entire span.

  Determining a maximum safe speed

The central angle is 35 degrees, the superelevation is 0.08, and 20.6 ft is cleared (for sight distance) from the inside edge of the innermost lane. Determine a maximum safe speed (assuming current design standards) to the nearest 5 mi/h.

  Design the weir structure in order to accommodate the design

Along the length of the channel the bed drops by an average of 2.5 metres every kilometre. Historic accounts indicate that the maximum flow of water in the channel prior to the construction of the gauging structure was 1.4 m.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd